3-
Installation
Procedures
Chart 3-1 describes the procedures to follow when installing a QCA146
RPE cabinet.
Chart 3-2 describes the procedures to follow when installing an
additional QSD66 PE or QSD74 RPE shelf assembly in an existing
QCA146 RPE cabinet.
Chart 3-3 describes the procedures to follow when installing a QBL24
Battery Unit.
Chart 3-4 describes the procedures to follow when installing an
expansion QBL24 Battery Unit.
Chart 3-5 describes the procedures to follow when installing a QUA6
Power Fail Transfer Unit (PFTU).
Chart 3-6 describes the procedures to follow when installing alarm and
transfer wiring (P10).
Chart 3-7 describes the procedures to follow when installing a QPC705
power converter.
Chart 3-8 describes the procedures to follow when installing QUD24
cooling units.
Chart 3-9 describes the procedures to follow when installing a QCAD321
junction box assembly.
Chart 3-10 describes the procedures to follow when installing QBL15
battery distribution box.
2-Mb/s Remote Peripheral equipment
3-1 of 50 pages
Appendix 1 to 553-2741-200
Need help?
Do you have a question about the QCA146 and is the answer not in the manual?
Questions and answers