Northern Telecom QCA146 Installation And Testing Instructions page 14

2-mb/s remote peripheral equipment cabinet and shelf
Hide thumbs Also See for QCA146:
Table of Contents

Advertisement

Installation
3-5
the RPE shelf. At the remote end, QPC477A23 BTU are
installed from the front of the RPE shelf in the connectors
located between positions 3 and 4, 6 and 7, 9 and 10.
—continued—
2-Mb/s Remote Peripheral Equipment
Appendix 1 to 553-2741-200

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the QCA146 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Qsd74Sl-1

Table of Contents