Gamatronic MEGA V2 250 Installation Manual page 4

Modular ups system up to 250 kw
Table of Contents

Advertisement

G
E
I
L
.
AMATRONIC
LECTRONIC
NDUSTRIES
TD
LIST OF FIGURES
Figure 1: Recommended clearances around the MegaV2 250 UPS ................................................... 4
Figure 2: The cable guard (without and with its rear panel) ................................................................. 5
Figure 3: Attaching the cable guard ..................................................................................................... 6
Figure 4: Recommended standard system connections ...................................................................... 9
Figure 6: Alternate battery connection option .................................................................................... 12
Figure 7: Power terminals on the rear of the MegaV2 250 ................................................................ 13
Figure 8: Connections for EPO switch and EPO indication ............................................................... 14
Figure 9: Closer view of dry contact terminals ................................................................................... 15
Figure 10: Close-up of dry contact terminals ..................................................................................... 15
Figure 11: Pin usage in D9 alarm connector. ..................................................................................... 16
Figure 12: Initial configuration wizard, "welcome" screen ................................................................. 17
Figure 13: Initial config. wizard: password entry ............................................................................... 17
Figure 14: Initial config. wizard: set number of modules ................................................................... 18
Figure 15: Initial config. wizard: number of battery cabinets ............................................................. 19
Figure 16: Initial config. wizard: set battery capacity ........................................................................ 19
Figure 17: Initial config. wizard: set date and time ............................................................................ 20
Figure 18: Initial config. wizard: set time zone .................................................................................. 20
Figure 19: Finish configuration wizard ............................................................................................... 21
Figure 20: The "alarms" icon indicates alarm conditions ................................................................... 22
Figure 21: IP address configuration ................................................................................................... 23
Figure 22: Network Connections screen ............................................................................................ 25
Figure 23: Local Area Connection Properties screen ........................................................................ 25
Figure 24: Internet Protocol (TCP/IP) Properties screen ................................................................... 26
Figure 25: Moving a power module requires two persons ................................................................. 27
Figure 26: Left side of a module viewed from the front ...................................................................... 28
Figure 27: Left side of module shelves .............................................................................................. 29
Figure 28: Communication cable on right side of module .................................................................. 30
Figure 29: Turning off a module ......................................................................................................... 31
Figure 30: "Status > Modules" screen ................................................................................................ 31
Figure 31: Verifying status of replacement module ............................................................................ 33
Figure 32: Status > Modules > Output ............................................................................................... 33
Figure 33: Turning off a module ......................................................................................................... 35
Figure 34: Turning on a module ......................................................................................................... 36
Figure 35: Verifying status of added module ...................................................................................... 36
Figure 36: Status > Modules > Output ............................................................................................... 37
Figure 37: Turning off a module ......................................................................................................... 38
Figure 38: "Status > Modules" screen ................................................................................................ 38
Figure 39: Opening the cover of the LCD mounting point .................................................................. 40
Figure 40: The mounting post is revealed .......................................................................................... 40
Figure 41: Attaching the clamp to the mounting post, part 1 ............................................................. 41
Figure 42: Attaching the clamp to the mounting post, part 2 ............................................................. 41
Figure 43: Slide LCD screen onto the mounting clamp ..................................................................... 42
Figure 44: The screen's cable projects from right side of UPS frame ............................................... 43
Figure 45: Attach comm. cable to the LCD screen ............................................................................ 44
Figure 46: The MegaV2 250 ............................................................................................................... 45
Figure 47: The front-left of the MegaV2 250 ....................................................................................... 45
Figure 48: The flat cables ................................................................................................................... 46
Figure 49: The power cord ................................................................................................................. 46
Figure 50: The left side of the computer ............................................................................................ 46
iv
MegaV2 250 Installation Guide, Release 2.2

Advertisement

Table of Contents
loading

Table of Contents