Completing Inventory For Your Preinstalled Server; Removing The Shipping Bracket And Connecting Power Cords And Power Distribution Unit (Pdu) For Your Preinstalled Server - IBM Power E1050 Manual

Table of Contents

Advertisement

Completing inventory for your preinstalled server

Use this information to complete inventory for your server.
About this task
To complete the inventory, complete the following steps:
Procedure
1. Verify that you received all the boxes you ordered.
2. Unpack the server components as needed.
3. Complete a parts inventory before you install each server component by following these steps:
a. Locate the inventory list for your server.
b. Ensure that you received all the parts that you ordered.
Note: Your order information is included with your product. You can also obtain the order
information from your marketing representative or the IBM Business Partner.
If you have incorrect, missing, or damaged parts, consult any of the following resources:
• Your IBM reseller.
• IBM Rochester manufacturing automated information line at 1-800-300-8751 (United States
only).
• The Directory of worldwide contacts website http://www.ibm.com/planetwide. Select your
location to view the service and support contact information.
Removing the shipping bracket and connecting power cords and power
distribution unit (PDU) for your preinstalled server
Before you set up a console, you must remove the shipping bracket and connect power cords.
About this task
Attention:
• Attach an electrostatic discharge (ESD) wrist strap to the front ESD jack, to the rear ESD jack,
or to an unpainted metal surface of your hardware to prevent the electrostatic discharge from
damaging your hardware.
• When you use an ESD wrist strap, follow all electrical safety procedures. An ESD wrist strap
is used for static control. It does not increase or decrease your risk of receiving electric shock
when using or working on electrical equipment.
• If you do not have an ESD wrist strap, just prior to removing the product from ESD packaging and
installing or replacing hardware, touch an unpainted metal surface of the system for a minimum
of 5 seconds.
To remove the shipping bracket and connect power cords, do the following:
Procedure
1. Remove the six screws that secure the shipping bracket to the chassis.
2. Cable the server.
a. Connect the system power cords from the server and I/O drawers to the PDU with an IEC 320 type
receptacle.
b. Attach the PDU input power cord and plug it into the power source.
16  Power Systems: Installing the IBM Power E1050 (9043-MRX)

Advertisement

Table of Contents
loading

This manual is also suitable for:

9043-mrx

Table of Contents