Traub TNX65/42 Maintenance Instruction
Hide thumbs
Also See for TNX65/42
:
Installation instructions manual
(66 pages)
1
2
Table Of Contents
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
page
of
76
Go
/
76
Contents
Table of Contents
Bookmarks
Table of Contents
Table of Contents
Safety
Symbols
Documentation Safety Instructions
Maintenance Instructions
Fuels
Visual Inspection of All Fluid Lines and Wiring
Maintenance and Repair Work
Maintenance Intervals
Operating Hours Counter
Maintenance Kits and Spare Parts
Screen Display
Fire Protection Device
Testing / Servicing the Fire Protection Device
On Completion of Maintenance Work
Lubrication Schedule
Daily Visual Inspection
A01
Complete Machine
Check Safety Mechanisms
Check There Are no Accumulations of Metal Chips in the Working Area; any Deposits Found Must be Removed
Look for Visible Oil or Lubricoolant Leaks
A02
Working Area Door
Examine the Window Pane
Cleaning the Window Pane
A03
Chip Conveyor
Check the Pre-Filter Box on the Chip Conveyor for Accumulations of Metal Chips and Remove Them if Necessary
A04
Hydraulic System
Check Filling Level and Top up if Necessary
Maintenance Work Every 200 Hours of Operation
B01
Hydraulic System
B02
Chip Conveyor
Check the Chip Conveyor for Fouling Around the Level Switch and Clean It if Necessary
B03
Central Lubrication Unit
B04
Pneumatic System
B05
Power Clamping Chuck
Clean and Lubricate as Specified by the Manufacturer
B06
Parts Conveyor
B07
Lighting in the Working Area
B08
Transition from Working Area to Coolant / Oil Spray Extractor
B09
Cover in the Working Area
B10
Fluid Cabinet
B11
Bar Feeding Magazine
Check Oil Level
Maintenance Work Every 1 000 Hours of Operation
C01
Maintenance Work Every 200 and 1 000 Operating Hours
C02
Pneumatic System
Replace Active-Carbon Filter Cartridge
Maintenance Work Every 2 000 Hours of Operation
D01
Maintenance Work Every 200 and 1 000 Operating Hours
D02
Hydraulic System
Replace Filter Cartridge in the Pressure Filter
D03
Axes
D04
Hollow Clamping Cylinder, Main Spindle / Opposed Spindle if Applicable
Clean Lubricoolant Collecting Pan
D05
Ball Screw Transmission, X-Axis, Z-Axis, V-Axis and Y-Axis
Determine the Reversing Backlash
D06
Covers in the Working Area
Check Wipers
Replace Wipers
Maintenance Work Every 4 000 Hours of Operation
E01
Maintenance Work Every 200, 1 000 and 2 000 Operating Hours
E02
Hydraulic System
Replace Hydraulic Fluid
E03
Power Clamping Mechanism
E04
Top Turrets
E05
Control Cabinet
Clean the Interior of the Control Cabinet
Check and Retighten Connections
Maintenance Work Every 8 000 Hours of Operation
F01
Maintenance Work Every 200, 1 000, 2 000 and 4 000 Operating Hours
F02
Chip Conveyor
Change Transmission Oil
F03
Machine
F04
O-Rings
Check and if Necessary Replace O-Rings
Safety-Related Maintenance Every 1, 2, 4 and 8 Years
G01
Annual Check of Emergency off Function
G02
Annual Maintenance of the Automatic Working Area Door
Check Mechanical Rail of Automatic Working Area Door
G03
Annual Check of the Repeat Blowing Unit
Check Storage Batteries and Replace Them if Necessary
G04
Maintenance of the Repeat Blowing Unit Every 2 Years
Replace Storage Batteries
G05
Maintenance of the Uninterruptible Power Supply Every 2 Years (Optional)
Replace Storage Batteries
G06
Maintenance of Control Console / Control Cabinet Every 4 Years
Replace PC/NC Buffer Batteries
G07
Maintenance of Control Cabinet Every 4 Years
Check Buffer Batteries
Replace Buffer Batteries
G08
Maintenance of the Working Area Door Every 8 Years
Replace Window Pane (Polycarbonate)
Maintenance Checklist TNX65/42
Advertisement
Quick Links
1
Table of Contents
2
Maintenance Instructions
3
Screen Display
4
Complete Machine
Download this manual
Maintenance Instructions
TNX65/42
TX8i-s
TNX65/42 as from serial No. 7060436
TNX65/42 Value package
142969 - 10.2016
WTAL-en/Ru
Table of
Contents
Previous
Page
Next
Page
1
2
3
4
5
Advertisement
Table of Contents
Need help?
Do you have a question about the TNX65/42 and is the answer not in the manual?
Ask a question
Questions and answers
Related Manuals for Traub TNX65/42
Industrial Equipment Traub TNX65/42 Installation Instructions Manual
(66 pages)
Industrial Equipment Traub TNL12.2 Operating Instructions Manual
(98 pages)
Industrial Equipment Traub TNL20 Operating Instructions Manual
(74 pages)
Industrial Equipment Traub TNL20 Operating Instructions Manual
(110 pages)
Industrial Equipment Traub TX8i-s Maintenance Instruction
(76 pages)
Industrial Equipment Traub TNA400.2 Operating Instructions Manual
(100 pages)
Industrial Equipment Traub TNX200.3 Operating Instructions Manual
(148 pages)
Industrial Equipment Traub TNX220 Operating Instructions Manual
(148 pages)
Industrial Equipment Traub INDEX G400.2 Technical Information
Tool holder (28 pages)
This manual is also suitable for:
Tx8i-s
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL
Need help?
Do you have a question about the TNX65/42 and is the answer not in the manual?
Questions and answers