Communication; Communication Network Introduction - GE GEP User Manual

3.0-6.0kw single phase
Hide thumbs Also See for GEP:
Table of Contents

Advertisement

Electrical Connection

6.5 Communication

6.5.1 Communication Network Introduction

Power Limit Network
The PV station generates power for self-consumption, but the electric equipment cannot
consume all the generated power. The inverter can monitor the on-grid electric data in real-time
and adjust the output power via a smart meter to avoid the residual current feeding back to the
utility grid.
GM1000
Inverter
PV String
CT90
Both the current sampling accuracy error margin of CT and the output voltage sampling
accuracy error margin of the inverter are ±1%, so the output power sampling accuracy error
margin of the inverter is ±2%.
Inverter
PV String
Circuit
Breaker
Loads
Circuit
Breaker
Loads
24
User Manual V1.3-2022-11-18
Utility Grid
Utility Grid

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gep3.6-1-30Gep4.2-1-30Gep5.0-1-30Gep6.0-1-30

Table of Contents