Assembly Instructions
You will need the following:
• Power Drill
• 1/4" Drill Bits
• 1/2" Open End Wrench
Turn the Cyclone (A) upside-down. Place the Gasket (B)
1
on the base of Cyclone and align all the holes. Place the
topside of the Lid (E) against the Gasket and align all the
holes. Secure the Cyclone, Gasket and Lid together using
six Bolts (C1), six Washers (C2), and six Hex Nuts (C3) as
shown in [FIG. 1].
Note: Tighten hardware evenly to eliminate air leaks. DO
NOT OVERTIGHTEN! On the Lid there are hex-shaped
recesses for ease of installation of the nuts.
10
Oneida Air Systems
• 7/16" Open End Wrench
• Wet/Dry Vacuum
• Vacuum hose adapters
E
C2
FIG. 1
C3
B
C1