Installation Requirements - ETC ALCR-DIN Installation Manual

Hide thumbs Also See for ALCR-DIN:
Table of Contents

Advertisement

ETC Installation Guide
ALCR-DIN
Note:
The normal power sense feed allows the ALCR-DIN only to detect
the loss of normal power; it does not connect to the load. In order
to control fixtures that are intended to operate under both normal
power and emergency power, a branch circuit fed from a
normal/emergency panel is required.
Applications that require emergency transfer of single branch
circuits, such as phase-dimmed circuits, should use the ETC
SC1008 branch circuit emergency lighting transfer switch
(BCELTS). For more information, visit the ETC website:
etcconnect.com/SC1008.

Installation Requirements

The ALCR-DIN is designed to be permanently installed on a 35 mm 
(1.3 in) DIN rail that complies with DIN 43880 and EN 60715.
After you install the Automatic Load Control Relay, configure the time
delay. See
WARNING:
only be installed by a qualified installer or electrician.
Follow all local codes for installation. Before terminating
the AC power wiring verify that the breakers for the
normal power and emergency power are in the off position
and follow the proper lockout/tag out procedures required
by NFPA Standard 70E.
AVERTISSEMENT :
appareil utilise une haute tension et ne doit être installé
que par un installateur qualifié ou un électricien. Suivez
tous les codes locaux pour l'installation. Avant de raccorder
le câblage du courant alternatif, vérifiez que les
disjoncteurs pour l'alimentation normale et pour
l'alimentation de secours sont en position d'arrêt et suivez
les procédures de vérouillage/étiquetage prescrites par la
norme NFPA 70E.
ALCR-DIN
The ALCR-DIN does not provide emergency power transfer.
Configure a Time Delay on page 6
This device utilizes high voltage and should
RISQUE DE DÉCHARGE ÉLECTRIQUE! Cet
.
Page 2 of 12
ETC

Advertisement

Table of Contents
loading

Table of Contents