Scenario In Which Sun2000S Are Connected To Other Management Systems; Energy Control; Grid-Tied Point Control - Huawei SUN2000-M3 User Manual

Table of Contents

Advertisement

SUN2000-(20KTL, 29.9KTL, 30KTL, 36KTL, 40KTL)-
M3
User Manual
Connecting to SmartPVMS Quick Guide (Inverters + SmartLogger3000 +
MBUS Networking)
7.2 Scenario in Which SUN2000s Are Connected to
Other Management Systems
Step 1 Open the SUN2000 app, scan the QR code of the SUN2000 or manually connect
to the WLAN hotspot to access the device commissioning screen.
Step 2 Select installer and enter the login password.
Step 3 Tap Log in to access the quick settings screen or SUN2000 home screen.
Figure 7-4 Logging In to the app
----End

7.3 Energy Control

7.3.1 Grid-tied Point Control

Function
Limits or reduces the output power of the PV power system to ensure that the
output power is within the specified range.
Procedure
Step 1 On the home screen, choose Power adjustment > Grid-tied point control.
Issue 11 (2023-01-10)
.
NO TE
Inverters manufactured after July 20, 2022 do not support the AC MBUS.
Copyright © Huawei Technologies Co., Ltd.
7 Man-Machine Interaction
66

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents