SUN2000-(20KTL, 29.9KTL, 30KTL, 36KTL, 40KTL)-
M3
User Manual
4.4 Moving the SUN2000
● After placing the equipment in the installation position, unpack it with care to
prevent scratches. Keep the equipment stable during unpacking.
Procedure
Step 1 Lift the SUN2000 from the packing case and move it to the specified installation
position.
Issue 11 (2023-01-10)
Figure 4-6 Stacked installation (not recommended)
Figure 4-7 Back-to-back installation (not recommended)
NO TE
The installation diagrams are for reference only and are irrelevant to the SUN2000
cascading scenario.
NO TICE
Copyright © Huawei Technologies Co., Ltd.
4 Installation
27