Assembly Instructions - Db110 - Kreg FOREMAN DB55 Instructional Manual

Hide thumbs Also See for FOREMAN DB55:
Table of Contents

Advertisement

Assembly Instructions - DB110 Electric
5.
Semi-Automatic Electric Foreman DB110 Assembly
Entirely electric, no compressed air needed.
Motor rated at 3/4-HP and 8-amps
Assemble the Handle
(Fig. 5A)
The Handle for the Foreman is disconnected for shipping purposes.
The handle is shipped with two nut and bolt sets installed finger tight
in the Handle and Operator Assembly.
1. Remove both nuts and washers from their respective bolts and
align the first set of holes in the Handle and the Operator Assembly.
2. Push the first bolt through the Handle and Operator Assembly and
attach the washer and nut.
3. Align the second set of holes in the Handle and the Operator
Assembly and push the second bolt through the Handle and
Operator Assembly and attach the remaining washer and nut.
4. Tighten both nut and bolt sets.
Attach the Mechanical Clamping Tower
To attach the Mechanical Clamping Tower a bolt must be secured
that is located on the underside of the machine. This operation may
be performed with the machine placed on its side on a workbench to
more easily reach the bolt. Refer to figure 5B and 6B for assembly.
Location of the bolt is the same for electric and pneumatic models.
1. Remove all packing material from the Mechanical Clamping Tower
prior to attaching the Tower to the Fence.
2. The anchoring bolt for the Clamping Tower passes through the
EZ DB Fence and is held in position with a nut for shipping
purposes. Remove the Nut from the 5/16-18 Bolt and use a ¼"
Allen Wrench to thread the anchoring bolt into the bottom of
the Clamping Tower.
3. Align the Clamping Tower so it sits squarely on the EZ DB Fence
and tighten the anchoring bolt.
Connect the Clamping Linkage
The Transfer Bars are disconnected from the Operator Assembly for
shipping purposes. You will need to attach each Transfer Bar to the
sides of the cam contained on the Operator Assembly.
1. Remove the 1/4" diameter X 3/4" long Clevis and Cotter Pin from
the Operator Assembly.
2. Align each of the Transfer Bars outside the cam on the Operator
Assembly.
3. Push the Clevis through the aligned holes and attach the Cotter Pin.
(Fig. 5B & 6B)
(Fig. 5C)
Handle with bolts, washers, and nuts properly installed.
The anchoring bolt is accessed from under the machine.
Align the Transfer Bars to the outside of the cam
contained on the operator assembly.
Fig. 5A
Fig. 5B
Fig. 5C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Foreman db110

Table of Contents