Blue Sea EVOLUTION G47 Service Manual page 11

Pasta cookers
Table of Contents

Advertisement

Water Connection
NOTE:
The water connection shall be installed in accordance with local water regulations in force and the applicable
standard/code, e.g. EN 1717 in UK / Ireland, PCA in Australia.
A cold water supply must be connected to the water inlet connection (R
and 135mm from the floor.
The water inlet pressure must be as follows:-
Minimum water supply pressure 150 kPa (22 psi).
Maximum water supply pressure 550 kPa (80 psi).
Drainage Connection

The water is drained from the appliance by means of a valve located behind the front control panel.

A waste water tundish must be fitted below the appliance drain outlet. This should be a minimum of 127mm (5") major
diameter.

If required the drain outlet can be extended in order to exit above the tundish. All drain piping must be with materials
suitable for conveying boiling water.

Drain connection is R1" BSP drain / overflow.
Commissioning
The following commissioning checks must be carried out before the pasta cooker is handed over for use, to ensure
that the unit operates correctly and the operator(s) understand the correct operating procedure.
1.
Before leaving the new installation;
a.
Check the following functions in accordance with the operating instructions.

Light the Pilot Burner.

Light the Main Burner.
b. Ensure that each operator has been instructed in the areas of correct lighting, operation, and shutdown procedures for
the appliance.
NOTE:
If it is not possible to get the appliance to operate correctly, shut off the gas supply and contact the supplier
of this unit.
Blue Seal Evolution Series - G47 Gas Pasta Cooker
Amendment 6
1
/
" BSP), located 50mm from the LH side, 555mm from rear
2
9
Installation
© Copyright Moffat Ltd, March 2016
2

Advertisement

Table of Contents
loading

Table of Contents