Download Print this page
Hide thumbs Also See for Aerofoil:

Advertisement

Quick Links

Advertisement

loading
Need help?

Need help?

Do you have a question about the Aerofoil and is the answer not in the manual?

Questions and answers

Summary of Contents for The Splash Lab Aerofoil

  • Page 2 Technical Drawings Components List Before you Install Installation Guide Warranty Contact Information...
  • Page 3 18.00" BASIN SYSTEM MANUAL...
  • Page 4 Grate housing extrusion Sprung steel grate Waste support bracket Waste funnel Leg assembly w/ clamp block Please check that all components are included and advise The Splash Lab if any parts are missing. Fixings method for your project. AEROFOIL BASIN SYSTEM MANUAL...
  • Page 5 IMPORTANT MUST READ The Setting out of the Aerofoil support system will determine AEROFOIL BASIN SYSTEM MANUAL...
  • Page 6 AEROFOIL BASIN SYSTEM MANUAL...
  • Page 7 STEP 2 - Using the fixings supplied and a socket wrench, secure parts as shown and clip on the end caps. (End caps are stored inside the washplane extrusion) AEROFOIL BASIN SYSTEM MANUAL...
  • Page 8 BASIN SYSTEM MANUAL...
  • Page 9 STEP 5 - Ensure the frame is level and mark hole positions. AEROFOIL BASIN SYSTEM MANUAL...
  • Page 10 AEROFOIL BASIN SYSTEM MANUAL...
  • Page 11 BASIN SYSTEM MANUAL...
  • Page 12 DETAIL A AEROFOIL BASIN SYSTEM MANUAL...
  • Page 13 STEP 9 - Secure PVC gulley extrusion (Part C) and waste support bracket (Part F) using the self tapping fixings provided. Ensure the gulley is aligned correctly to the leg assembly before attaching the waste support plate. STEP 10 - Fit waste funnel(s) (Part G) using the fixings provided. AEROFOIL BASIN SYSTEM MANUAL...
  • Page 14 AEROFOIL BASIN SYSTEM MANUAL...
  • Page 15 STEP 12 - Insert the grate(s) (Part E) into the grate housing extrusion (Part D). Then lift and position the extrusion (D) onto the assembly. The rear slots will interface with the frame if positioned correctly. Proceed to attach clamping plates as shown. AEROFOIL BASIN SYSTEM MANUAL...
  • Page 16 AEROFOIL BASIN SYSTEM MANUAL...
  • Page 17 AEROFOIL BASIN SYSTEM MANUAL...
  • Page 18 STEP 15 - Board your wall making sure to leave aperatures for STEP 15 - Board your wall making sure to leave apertures access, above and below the aerofoil system. for access AEROFOIL BASIN SYSTEM MANUAL...
  • Page 19 AEROFOIL BASIN SYSTEM MANUAL...
  • Page 20 AEROFOIL BASIN SYSTEM MANUAL...
  • Page 21 STEP 18 - Lower the grates (Part E) to meet the washplane (Part A) AEROFOIL BASIN SYSTEM MANUAL...
  • Page 22 STEP 19 - You are now ready to plumb your Aerofoil. STEP 20 - You are now ready to plumb your Aerofoil. AEROFOIL BASIN SYSTEM MANUAL...
  • Page 23 1 Year Mechanical Warranty If a defect is found in normal use, The Splash Lab will, at their discretion, repair, provide a replacement part or product, or make appropriate adjustments. Damage caused by accident, misuse, or abuse is not covered by this warranty.
  • Page 24 General information info.usa@thesplashlab.com 310 410 5008 8745 Washington Blvd, Studio D Culver City, CA 90232 Technical support info.usa@thesplashlab.com For further contact information visit: www.thesplashlab.com...