Honda E1500 Shop Manual page 25

Hide thumbs Also See for E1500:
Table of Contents

Advertisement

23
9-6
INSPECTION
OF VOLT
METER"
1" Remove
the control box.
(See
page
20.)
2.
Loosen
six
4
mm
screws
and remove
the
cover.
Connect
the
8-F
coupler and
wire
leads
to
the
engine
and
volt
meter
terminals.
3.
Run the
generator
at
the rated
speed
and
measure
the
voltage
across
the
rneter terminals.
The meter should
be
replaced
if
any
voltage
is
measured.
Replacernent
of Volt
Meter:
Disconnect
all
the wire
leads
and remove the
four 3
rnm
nuts"
Iake out
the
otrd
rneter
and
install
a
new
one.
After
instdling
a new
meter, z*ro-adjust
the
needle
by
turning
the
adjusting
screw
either
right or
left
as
necessary.
9-7
TNSPECTION
OF ENGINE
SWITCTI
1.
Remove
the control box.
(See page 20")
2.
Loosen
six
4
rnm
screws
and
remove
the
cover"
3. Using
afi
ohmmetetr,
check
for
continuity
between
the
black switch
leads.
The switch
is
normal
if
there
is
con-
tinuity with
the
switch
OFF.
There should
be
no
continuity
with the
switch
CII\i.
NOTE: The
engine
switch can also
be
inspected
without
rernoving
the control box from the frame.
In
this
case,
check
the
continuity
between
the
black
lead
(to
the
engrne)
and
ground.
R"eplacermemt
of
Engine Switch:
a.
Remove
ttre
4
rnm
screw
and
disconnect
the
engine
switch
ground lead
(black)
f,rom
the control
box.
b"
Remove
the
nut
and take
cut
the
switch.
Date
of
lssue: Dec.,
1977
o
lloNDA
MOTOR CO.,
LTD
Fig.
9-9
Yolt
meter
Tester
Red
wire
lead
BIue
wire
lead
(1)
(2)
(r)
{2}
(3)
Positive
(+) terminal
(4)
Negative
(-)
terrninal
(3)
3 nnm
nut
(4)
Zera-adjustment
screw
Fig.
9-
10
(1)
(2)
Fig.
9-
I
I
Black
lead
Black lead
Ground)
\
Fig.
9-1,2
(1)
Engine
switch
(2) Nut
L'i
C