Install The Router Using A Lift - IBM J11M Quick Start Manual

Table of Contents

Advertisement

IBM Ethernet Router J11M Quick Start
NOTE: For complete instructions on removing router components, see the IBM
Ethernet Router J11M Hardware Guide.

Install the Router Using a Lift

Before installing the router, you must remove all components (see "Remove
Components" on page 10). To install the router using a lift:
1.
2.
Figure 6: Load the IBM Ethernet Router J11M onto the Lift
3.
12
Step 3: Install the Router
Ensure that the rack is in its permanent location and is secured to the building.
Ensure that the installation site allows adequate clearance for both airflow and
maintenance. For details, see the IBM Ethernet Router J11M Hardware Guide.
Load the router onto the lift, making sure it rests securely on the lift platform
(see Figure 6 on page 12).
Using the lift, position the router in front of the rack or cabinet, centering it in
front of the mounting shelves.

Advertisement

Table of Contents
loading

Table of Contents