Step 1: Prepare The Site; Rack-Mounting Requirements - IBM J11M Quick Start Manual

Table of Contents

Advertisement

IBM Ethernet Router J11M Quick Start

Step 1: Prepare the Site

Figure 1: J11M Rack Clearance and Router Dimensions

Rack-Mounting Requirements

6
Step 1: Prepare the Site
You can install the router in a four-post open rack or open cabinet or an
open-frame rack.
An empty router weighs 150 lbs (68 kg). A fully-populated router weighs 350 lbs
(158.8 kg).
To lift routing devices and components, use the following lifting guidelines:
Up to 39.7 lbs (18 kg) 1 person lift.
39.7 lbs (18 kg) to 70.5 lbs (32 kg) 2 or more person lift.
70.5 lbs (32 kg) to 121.2 lbs (55 kg) 3 or more person lift.
Above 121.2 lbs (55 kg) material handling systems (such as levers, slings,
lifts and so on) must be used. When this is not practical, specially-trained
persons or systems must be used (riggers or movers).

Advertisement

Table of Contents
loading

Table of Contents