OPERATING THE EXCAVATOR
2. Adjusting the dozer width
To change from standard width to narrow width:
1. Pull out the fixing pin (2) and remove the extension
dozer (1).
2. Set the extension dozer (1) as in the following
illustrations and insert the fixing pin (2).
3. Perform the same operations on the opposite side
(left or right).
Standard width
(1) Extension dozer
(2) Fixing pin
Narrow width
(1) Extension dozer
(2) Fixing pin
Dozer widths
Standard width
Narrow width
NOTE :
• The operation for changing from standard
width to wide width is the same.
44
TRACK WIDTH ADJUSTMENT AND DOZER OPERATION
990 mm
750 mm
3. Operating the dozer
NOTE :
• While operating the dozer, the track width
change and dozer selection lever must be in set
position (A).
(1) Track width change and doz-
er selection lever
• Pulling the control lever back raises the dozer.
• Pushing the control lever forward lowers the dozer.
(1) Control lever
(A) "Raise"
(B) "Lower"
(A) "Dozer"
(B) "Track width change"
(A) "Raise"
(B) "Lower"
U10-5