Download Print this page

Golden JS-1400 Installation Manual page 16

Advertisement

Step 4-2:
CABLE ROUTING & SHEAVE INSTALLATION CONTINUED:
3. AGAIN, WITH THE THIMBLE END OF THE CABLE INHAND, PULL
THE CABLE BACK TO THE TOP OF THE TRACK AND FEED BETWEEN
THE TRACK MOUNT PULLEY PLATES ON THE RIGHTHAND SIDE.
BEND THE CABLE 180 DEG. AND FEED BACK BETWEEN THE PULLEY
PLATES ON THE LEFTHAND SIDE, CREATING A LOOP ABOVE THE
PLATES.
4. USING THE OTHER PROVIDED SHEAVE, INSERT SHEAVE BETWEEN
THE TRACK MOUNT PLATES AND AILGN THE HOLE IN THE SHEAVE
WITH THE CENTER HOLE IN THE PLATES. SLIP ONE FLAT WASHER
OVER THE PROVIDED ½" X 1-1/2" CLEVIS PIN AND SECURELY
FASTEN USING ONE OF THE TWO COTTER PINS BY SPREADING
BOTH PRONGS AWAY FROM ONE ANOTHER.

Advertisement

loading