Installation - Bardiani Valvole MIXPROOF B925 Use And Maintenance Manual

Hide thumbs Also See for MIXPROOF B925:
Table of Contents

Advertisement

4. Installation

1. CONNECTION OF AIR AND ELECTRICITY SUPPLY:
- Use authorised personnel to install/connect the valve.
- Ensure correct air pressure and quality (see page 34).
- Ensure correct electrical supply for Giotto-Top
Air
Air
Air
2. DISCONNECT SUPPLIES AFTER USE:
- Disconnect air supply.
- Disconnect electrical supply (for Giotto-Top
Risk of
damage!
Support
4. AVOID VALVE OVERLOADING AND COMPENSATE FOR:
- Vibration
- Thermal expansion
The Company BARDIANI VALVOLE reserves the right to modify its products at any time without prior notice.
Air
Air
Air
(see Giotto-Top
®
Electrical Connections
Giotto - Top
®
).
®
Electrical Connections
Giotto - Top
®
instruction manual).
®
Air
Air
Air
3. MOVING VALVE PARTS:
- Never stick fingers into valve ports.
- Never touch the shaft of the valve whilst it is working
Valve
Mixproof
5. CORRECT FLOW DIRECTION:
- If possible, have flow against valve closing
direction to avoid or minimise water
hammer.
Valve
Mixproof
Divert
(GB-IST-B925-0910) 5/35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mixproof b925b

Table of Contents