NEVER remove a valve from piping or disassemble it when the valve or piping are pressurised. We cannot be held responsible for incorrect installation, operation and maintenance! “BARDIANI reserves the right to modify without notice its products, including products already ordered”. (GB-IST-BBZPM-0413) 3/25...
4. AVOID VALVE OVERLOADING AND COMPENSATE FOR: 5. CORRECT FLOW DIRECTION: Vibration If possible, have flow against valve closing Thermal expansion direction to avoid or minimise water hammer. “BARDIANI reserves the right to modify without notice its products, including products already ordered”. (GB-IST-BBZPM-0413) 5/25...
Page 6
Remove inner valve parts. Weld body carefully into piping. Ensure tight connections between valve and piping. Assemble valve. Remember gaskets and fit correctly. Tighten unions firmly and carefully. See assembly instructions. BBZPM (positioner GEMU) Dimenson Valve (mm) DN15-20 DN25 DN32-40...
Page 7
5. HOT VALVE/PIPING: BBZPM: Pneumatic modulating valve Never touch hot valve or piping, if possible. BBZPM: Pneumatic modulating valve divert Alternatively use protective gloves. “BARDIANI reserves the right to modify without notice its products, including products already ordered”. (GB-IST-BBZPM-0413) 7/25 Valv.
Incorrect operation of actuator mally closed (NC) or vice versa Dirt in actuator Check and service actuator Incorrect positioning of valve Disassemble and reposition valve body body “BARDIANI reserves the right to modify without notice its products, including products already ordered”. (GB-IST-BBZPM-0413) 8/25...
Intermediate washing Atmosphere chlorids Washing 70° Nitric acid (HNO3) at 0,5% Water without chlorine or Final rinsing Atmosphere chlorids Recommended claning speed = 2 m/s “BARDIANI reserves the right to modify without notice its products, including products already ordered”. (GB-IST-BBZPM-0413) 9/25...
Always release fluid pressure from valve and Never touch hot valve or piping, if possible. piping before disassembling the valve. Alternatively use protective gloves. “BARDIANI reserves the right to modify without notice its products, including products already ordered”. (GB-IST-BBZPM-0413) 10/25 Valv. Valv. interc. Deviaz...
Check for correct operation Check for correct operation and absence and absence of leakage of leakage Periodical Record all actions taken Record all actions taken “BARDIANI reserves the right to modify without notice its products, including products already ordered”. (GB-IST-BBZPM-0413) 11/25...
10. Spare Parts Ordering NOTE! Please copy this page, fill it out and fax it to below address. À : BARDIANI VALVOLE S.P.A. – Ufficio Ricambi Fax: +3905253408 From: Valve type: Serial number: Month/Year of purchase: Shipping instructions: Quantity: Position no.:...
11. Disassembly of BBZPM 2. Remove support (36) with the GEMU positio- 3. Un screw positioner GEMU ner (214) and remove the cam (19). (214) from the support (36). 1. Remove the bolts (25). 1. Fix the guide bushing (17) 3.
Page 14
11. Disassembly of BBZPM 7. Remove from the cylinder (9) the cap (50). Remove ,from the same , gaskets 9. Remove screws M6x10 and guide bushing from 8. Remove screws (34) and (156 e 157) and the guide the cylinder (17) with a suitable tool. Remove assembly (35).
11. Disassembly of BBZPM BBZPM “BARDIANI reserves the right to modify without notice its products, including products already ordered”. (GB-IST-BBZPM-0413) 15/25...
12. Assembly of BBZPM 2. PTFE SHUTTER: 1. Pre-heat shutter ring (14*) to approx. 80°C to make Assembly the P.T.F.E. seal ring (14) on the shutter (2) it softer and insert it in shutter slot (2). Insert the ring and the shutter nut (28).
Page 17
12. Assembly of BBZPM 9. Release air pressure to air fitting (24) and remove 2 M6x10 to 8. Assemble body (1) and assembly allow assembly of the positioner GEMU. (35) with clamp (33). Counterhold! 10. Screw the positioner GEMU 11. Insert the support (36) with the GEMU (214) on the support (36).
13. Disassembly of BBZPM divert 2. Remove support (36) with the GEMU positio- 3. Un screw positioner GEMU ner (214) and remove the cam (19). 1. Remove the bolts (25). (214) from the support (36). 4. To fix the washer (17) through 2 screw M6x10 and supply air to fit- ting (24).
Page 19
13. Disassembly of BBZPM divert 4a. STANDARD SHUTTER: Remove shutter rings (14). 4b. P.T.F.E. SHUTTER: Unscrew il dado otturatore (28) from the double shutter stem (212), remove from the 5. Remove clamp (33) and upper double shutter (30) the P.T.F.E.
13. Disassembly of BBZPM divert “BARDIANI reserves the right to modify without notice its products, including products already ordered”. (GB-IST-BBZPM-0413) 20/25...
14. Assembly of BBZPM divert 2. PTFE SHUTTER: Assembly shutter ring (14) 1. Pre-heat shutter ring (14)* to approx. 80°C to make and shutter (30) with the stem (212). Assembly shutter ring it softer and insert it in shutter slot (2). Insert the ring (14) and shutter nut (28).
Page 22
14. Assembly of BBZPM divert COUNTERHOLD! Insert guide bushing (17) with 2 screws M6x10. Supply air to fitting (24) assemble lower body (1) and upper body Screw double shutter (30) into cylinder. (42) with clamp (33). Release air pressure and remove 2 Counterhold pivot with an allen wrench.
Shutter nut Double shutter Clamp Socket screw Assembly Plates Plug Upper body Seal ring Guide bushing Seal ring Seal ring Stem double shutter Positioner “BARDIANI reserves the right to modify without notice its products, including products already ordered”. (GB-IST-BBZPM-0413) 23/25...
- For fl uids in Group 1 with a DN greater than 25 - Valve size DN125 only for fl uids in Group 2 “BARDIANI reserves the right to modify without notice its products, including products already ordered”. (GB-IST-BBZPM-0413) 24/25...
12 (twelve) months from the date of delivery. Notification of any product defects and/or faults must be sent in writing to Bardiani Valvole S.p.A. within 8 (eight) days of coming to light, providing adequate documentation of the defect/fault encountered can be provided as evidence.