In-Box Testing & Inspection
Before removing the LCD display from the carriage, in-box testing and inspection are
required.
Note:
safe transport and storage prior to mounting. Carefully follow the testing and inspection
steps below. Do not break the tamper seal until testing and inspection is successfully
completed. If damage or failure is observed, contact Planar Technical Support immediately.
1 Carefully lift at the handles to move the
carriage from the shipping carton to the
location of equipment required to test the
display.
ALWAYS
keep the carriage in the upright
position.
Clarity Matrix G3 LCD Video Wall System Installation Guide
020-1339-00H
The design of the carriage allows in-box testing and inspection of the LCD display and
In-Box Testing & Inspection
Page | 32