Intertek 25-CAB80 Manual page 24

Table of Contents

Advertisement

TEST REPORT FOR ENGLAND STOVE WORKS, INC.
Report No.: 103348206MID-001BR2
Date: 06/14/22
SECTION 13
REVISION LOG
REVISION #
DATE
0
03/15/18
1
04/13/18
2
6/14/22
The following are Appendices to this report:
Appendix A – Laboratory Operating Procedure
Appendix B – Data and Calculation Forms
Appendix C – Calibration Documents
Appendix D – Unit Drawings and Installation Manual (CBI), Installation Manual (Non-CBI)
Appendix E – Dry Gas Meter Calibration Data
Appendix F – Unit Preburn Documentation
Appendix G - Pictures
Version: 05/10/17
PAGES
REVISION
N/A
Original Report Issue
Added similar models 55-SHPCAB80, 55-
TRPCAB80, 25-CAB80S, 55-SHPCAB80S
and 55-TRPCAB80S to conclusion of
N/A
report.
Updated
3
information
Test Fuel Properties updated to identify
5
test fuel used
Added anomalies, appropriateness, and
validation statement. Added note for not
17
measuring ambient particulates.
18
added medium burn rate statement
22
Added Appendices
Appendix
Added 50+ hours of conditioning burn
F
data
Page 22 of 22
8431 Murphy Drive
Middleton, WI 53562
Telephone: 608-836-4400
Facsimile: 608-831-9279
www.intertek.com/building
the
conditioning
burn
GFT-OP-10c

Advertisement

Table of Contents
loading

This manual is also suitable for:

55-shpcab8055-trcab80

Table of Contents