Intertek 25-CAB80 Manual page 101

Table of Contents

Advertisement

• Reinstall the venting system and panels.
• NOTE: As an option, there is a Combustion Motor Gasket that is included with Part # PU-CBMG, which
allows you to remove the motor (only) from the combustion blower housing, clean the motor and
inside of the blower housing, and replace the motor and its gasket without having to remove the entire
Combustion Blower. Remember that the blower impeller, blower tube and steel blower exhaust tube
on the stove should be brushed and vacuumed.
Convection Blower Cleaning
• As always, be certain the stove is cool and unplugged before servicing any components within the
unit. Since the convection blower does not handle any by-products of combustion, it does not
require serious cleaning like the exhaust blower.
• However, dust from the home and other debris in the air can accumulate on the blades of the
convection blower. Any dust that has built up on the fan blades can usually be easily removed with
a vacuum or a soft paint brush.
• The back panel will need to be removed from the stove, using a 5/16" wrench.
• The control (circuit) board will need to be removed, by removing the two 5/16" screws and pulling
the control board out of the stove. Some wire ties may need to be cut so that the board can be
pulled out of the way of the blower (remember to replace them).
• Four 5/16" screws will need to be removed in order to remove the convection blower from the
stove. You will likely need a socket with a long extension.
• Install the blower in the reverse order as described above.
• Also see the Convection Blower removal instructions in the Replacing Components section of the
manual.
FINISH
• This new unit has been painted with High-Temperature paint that should retain its original look for
years.
• If the unit should get wet and rust spots appear, the spots can be sanded with fine steel wool and
repainted. It is crucial that only High-Temperature Spray Paint is used (Part# AC-MBSP), as others
may not adhere to the surface or withstand the high temperatures.
• Similarly, some brands of paint will not adhere to different brands of paint, so we highly
recommend using our proprietary High-Temperature Spray Paint.
GASKETS
• Gaskets should be inspected and replaced annually. See the Gaskets page in Replacing Components
(page 49) for information and instructions.
IMPORTANT! READ AND FOLLOW ALL INSTALLATION AND MAINTENANCE INSTRUCTIONS, INCLUDING CLEANING THE UNIT AS SPECIFIED, AND
ENGLAND'S STOVE WORKS IS NOT RESPONSIBLE FOR ANY DAMAGE OR INJURY INCURRED DUE TO NEGLECT, OR DUE TO UNSAFE INSTALLATION OR
REPLACING GASKETS ANNUALLY, AND PARTS AS NEEDED.
USAGE OF THIS PRODUCT. CALL TECHNICAL SUPPORT WITH ANY QUESTIONS.
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

55-shpcab8055-trcab80

Table of Contents