Parts List; Checklist Before Installation - Moen INS2321B Installation Instructions Manual

One-piece ceramic toilet (wall drainage)
Table of Contents

Advertisement

随附
Supplied
A
D
自购
Self-Purchased
安装前确认
·安装前请仔细阅读此安装说明书,以便准备和熟悉所需要
的安装工具、材料、安装步骤和注意事项,避免由于安装不
当导致的不必要的损失。
·安装前,卫生间墙、地砖应已完成施工,且预留了坑管和
给水管路。
·请核对您选购的产品坑距尺寸与预留坑距相符(本产品要
求墙面预留排污口中心离地高度180mm)
·如果有旧的坐便器,先关闭水源再拆除旧坐便器并清洁地
面。如果是新安装坐便器,请关闭供水并清洁地面。
注意:
·地面应平整,否则可能导致坐便器安装后开裂。
·在安装之前和过程中,请用干净的物品堵住地面排污口,
防止工具、水泥、油泥等杂物掉落坑管内,堵塞管路。
C
B
E
F
零件清单
A. 陶瓷坐便器本体
B. 排污连接直管
C. 地脚固定配件包
D. 供水角阀
E. 供水连接管
F. 坐便器盖板

Parts List

A. Toilet Base
B. Waste Pipe
C. Screw Package
D. Angle Valve
E. Supply Hose
F. Toilet Seat

Checklist before Installation

Please read these instructions carefully to familiarize
·
yourself with the required tools, materials, and installation
sequences. This will help you avoid costly mistakes.
Final wall and Ceramic tiles are finished and the suggested
·
water supply and drain are reserved before installation.
Ensure that the drain has the correct roughing-in dimension.
·
This product requires the wall height of the reserved sewage
outlet center to be 180mm above the ground.
·If the toilet is installed from scratch,
and clean floor. If the toilet is to replace old toilet, turn off the
water supply and then remove the old toilet and clean floor.
Note:
Ensure the floor is smooth, or it will cause toilet damage.
·
Before and during the installation, block the drain with clean
·
objects, to prevent tools, cement, sludge and other debris
from falling into the pit pipe and blocking the pipe.
2
turn off the water supply

Advertisement

Table of Contents
loading

Table of Contents