ENGLISH You have purchased a product made by Pentair Jung Pum- Qualification and training of personnel All personnel involved with the operation, servicing, inspection pen and with it, therefore, also excellent quality and service. and installation of the equipment must be suitably qualified Secure this service by carrying out the installation works for this work and must have studied the instruction manual in in accordance with the instructions, so that our product...
DESCRIPTION NOTICE! If the electrode is shortened using The DKG monitors the oil chamber of the pump to check for a metal saw, the electrode rod itself must be water ingress. It is connected to the pump via a special elec- clamped, not the electrode housing.
Page 4
Name and address of the manufacturer: JUNG PUMPEN GmbH - Industriestr. 4-6 - 33803 Steinhagen - Germany - www.jung-pumpen.de We hereby declare, under our sole responsibility, that the product is in accordance with the specified Legislation. AGR GB (JP55611) DKG GB (JP55612) Other normative documents: Authorized person for technical documention JUNG PUMPEN - Stefan Sirges - Industriestr.
Need help?
Do you have a question about the DKG and is the answer not in the manual?
Questions and answers