Download Print this page

Included Components - ProCurve 9408sl Quick Start Manual

Routing switch
Hide thumbs Also See for 9408sl:

Advertisement

Included Components

Component
Notes
Power Cords
ProCurve 9408sl: Three power cords.
Caution: If the installation requires a different power cord than the one supplied with the switch or routing switch,
be sure to use a shielded power cord displaying the mark of the safety agency that defines the regulations for
power cords in your country. The mark is your assurance that the power cord can be used safely with the switch
or routing switch.
Console Cable
Connects a terminal or PC to a serial port on a ProCurve 9408sl management module for direct-connect access
to management using the Command Line Interface (CLI).
CESD Grounding Tap Kit
Use the Cable Electrostatic Discharge (CESD) Grounding Tap before connecting Category 5 or better UTP copper
networking cables to the routing switch. Refer to the documentation provided with the kit.
ESD Strap
Helps to prevent electrostatic discharge between your body and routing switch modules or chassis.
Rack Mount Kit
Contains two mounting brackets and the screws required to attach the brackets to the routing switch.
Product Documentation
• Read Me First (this document): Updates are periodically posted on the ProCurve website.*
• Installation and Basic Configuration Guide for the ProCurve 9408sl Routing Switch.
Installation Guide for
This single-sheet guide is included in the documentation set shipped with all ProCurve 9408sl modules.
XENPAK Optics
Warranty and Support
Included with routing switch chassis shipments.
Declaration of Conformity Included with routing switch chassis shipments.
* Go to http://www.procurve.com, click on Technical Support, then Product manuals. Click on ProCurve Routing Switch 9400 Series and
scroll to the publication you want to see.
14

Advertisement

loading