Filling Power Unit Reservoir / Preparing Hoses; Preparing Hoses (Cont'd) - QuickJack BL-3500 Installation And Operation Manual

Hide thumbs Also See for BL-3500:
Table of Contents

Advertisement

STEP 8
Filling Power Unit Reservoir
DURING THE START-UP PROCEDURE OBSERVE ALL
OPERATING COMPONENTS AND CHECK FOR
PROPER INSTALLATION AND ADJUSTMENT. DO NOT
ATTEMPT TO RAISE A LOAD UNTIL A THORUGH OP-
ERATIONAL CHECK HAS BEEN COMPLETED.
1. Remove complete oil reservoir fill cap and screw nut
assembly using an adjustable wrench.
2. Remove cap and place in a non-contaminated area.
3. Fill the reservoir with approximately 2 quarts of
automatic transmission fluid. Make sure the funnel used to
fill the power unit oil reservoir is clean.
4.
Replace oil fill cap assembly and tighten firmly.
Preparing Hoses
READ THE FOLLOWING PROCEDURES BEFORE
ATTEMPTING TO CONNECT HOSES TO QUICKJACK
AND POWER UNIT.
1. Remove protective caps from threaded fittings on
both ends of Twin Hose Assembly.
2. Wrap the threads with Teflon tape. When applying
tape, wrap it three times in direction shown below.
3. Install female quick-connect fitting onto threaded end.
13
STEP 9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bl-5000Bl-5000xl

Table of Contents