PRODUCT DESCRIPTION
Overall view
1
2
3
4
6
7
8
9
10
11
12
Legend
1.
Flue connector
2.
Air pressure switch
3.
Condensate discharge
4.
Main Heat Exchanger
6.
C.H. Flow temperature probe
7.
Burner
8.
Ignition electrodes
9.
Secondary heat exchanger
10. Gas valve
11. Safety valve (3 bar)
12. Spark generator
13. Pressure gauge
14. Filling valve
15. C.H. circuit filter
16. D.H.W. Flow meter
17. Circulation Pump with air release valve
18. Switch On/Off
19. C.H. Return temperature probe
20. Diverter valve
21. Detection Electrode
22. Combustion Chamber
23. Expansion vessel
24. Fan
50
/
Overall Dimensions
24
23
22
21
20
19
18
17
16
A. Central Heating Flow
15
B. Domestic Hot Water Outlet
14
C. Gas Inlet
D. Domestic Cold Water Inlet
13
E. Central Heating Return
Minimum clearances
In order to allow easy access to the boiler for maintenance
operations, The boiler must be installed in accordance with the
clearances stated below.
450
200
200
65
67 67
65
180
150
315
50
50