Download Print this page

Galvin Engineering TCWBC150C Product Installation

Cp-bs hospital wall bath set taps w/ 180 outlet lamina

Advertisement

Quick Links

Product Installation Guidelines
®
CliniLever
w/ 180 Outlet Laminar
PRODUCT CODES:
- TCWBC150C
- TCWBC80C
- TCWBJ150C
- TCWBJ80C
SPECIFICATIONS
®
The CliniLever
facilities, schools and in-home care.
®
CliniLever
products provide state of the art features to comply with the latest healthcare guidelines.
Contra rotating handles to ensure ease of use
Laminar flow nozzle supplied standard to reduce the spread of legionella.
Smooth round design to facilitate easy cleaning and to help reduce dirt and bacterial growth.
Quick action SBA's includes brass jumper valve / ceramic disc component, with red and blue indicator
buttons on 80mm or 150mm lever action handles.
IMPORTANT: All CliniLever
premises in good working order.
TECHNICAL DATA
Inlet
Outlet
Headwork
Working Pressure Range (kPa)
Working Temperature Range (°C)
Nominal Flow Rate (LPM)
Finish
NOTE: Galvin Engineering continually strive to improve their products. Specifications may change without
notice.
TOOLS REQUIRED
Power drill
Spanner and hex key
Thread tape
© Galvin Engineering Pty Ltd
CP-BS Hospital Wall Bath Set Taps
product range is primarily used for hand washing applications in hospitals, aged care
®
healthcare taps are tested in accordance with AS/NZS 3718 and leave our
Jumper Valve / Ceramic
Jumper Valve / Ceramic
Document No.: 001.00.10.05
Version 1, 7 April 2022, Page 1 of 5
80mm Handle - SERIES
5/8" BSP – Male
Laminar Flow Aerator
Jumper Valve / Ceramic Disc
Min
50
Max
500
Min
5
Max
80
5.0
Chrome
150mm Handle - SERIES

Advertisement

loading

Summary of Contents for Galvin Engineering TCWBC150C

  • Page 1 Jumper Valve / Ceramic Working Temperature Range (°C) Jumper Valve / Ceramic Nominal Flow Rate (LPM) Finish Chrome NOTE: Galvin Engineering continually strive to improve their products. Specifications may change without notice. TOOLS REQUIRED − Power drill − Spanner and hex key −...
  • Page 2: Pre-Installation

    If so, please contact us on 1300 514 074 Note: Before installation, all lines must be flushed. We recommend that a line strainer be installed prior to taps to eliminate any foreign material. TCWBC80C/TCWBJ80C TCWBC150C/TCWBJ150C © Galvin Engineering Pty Ltd...
  • Page 3: Installation

    Version 1, 7 April 2022, Page 3 of 5 INSTALLATION IMPORTANT: Galvin Engineering products must be installed in accordance with these installation instructions and in accordance with AS/NZS 3500, the PCA and your local regulatory requirements. Water and/or electrical supply conditions must also comply to the applicable national and/or state standards. Failing to comply with these provisions shall void the product warranty and may affect the performance of the product.
  • Page 4: Troubleshooting

    Complete SBA may need to be replaced. Handle is loose Screw has come loose Tighten handle screw Flange does not screw down Re-position tap bodies and breach Tap bodies are set too far out onto basin/sink surface piece © Galvin Engineering Pty Ltd...
  • Page 5: Warranty

    WARRANTY The warranty set forth herein is given expressly and is the only warranty given by the Galvin Engineering Pty Ltd. With respect to the product, Galvin Engineering Pty Ltd makes no other warranties, express or implied. Galvin Engineering Pty. Ltd. hereby specifically disclaims all other warranties, express or implied, including but not limited to the implied warranties of merchantability and fitness for a particular purpose.

This manual is also suitable for:

Tcwbj150cTcwbc80cTcwbj80c