Gx Device Connection - Victron energy BMV-700 Manual

Battery monitor
Hide thumbs Also See for BMV-700:
Table of Contents

Advertisement

3. Connect the new shunt to the electrical system and battery monitor head unit as shown in chapter
connections
[7]. Pay special attention to the orientation of the shunt circuit board in relation to the battery and load
connections.
4. Follow the setup wizard; see the
5. After completing the setup wizard, set the proper shunt current and shunt voltage according to the
Shunt voltage [32]
settings.
6. If the battery monitor reads a non-zero current, even when there is no load, and the battery is not being charged, calibrate the
zero current reading using the

3.8. GX device connection

If the system contains a GX device such as a
VE.Direct cable
or a
VE.Direct to USB
Once connected, the GX device can be used to read out all monitored battery parameters. For more information see chapter
Connecting to a GX device and the VRM portal
The battery monitor is connected to a
Page 9
Manual - BMV-700
Setup wizard [10]
chapter.
Zero current calibration [26]
setting.
Cerbo
GX, the battery monitor can be connected to the GX device using a
interface.
[21].
Loads
&
Chargers
Battery bank
Cerbo GX
Basic electrical
Shunt current [32]
and a
GX Touch
screen.
and the
Installation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bmv-702

Table of Contents