Loop Handle Set, Pipe Complete, Grip Set, Switch Lever, Lock Off Lever; Disassembling - Makita XRU09 Repair Manual

Hide thumbs Also See for XRU09:
Table of Contents

Advertisement

3 Loop handle set, Pipe complete, Grip set, Switch lever, Lock off lever

3-1 Disassembling

See Figs. 3-1-1, 3-1-2, 3-1-3 as follows and Figs. 3-1-4, 3-1-2, 3-1-3 in the next page.
Note: No need to remove Nylon cutting head / Plastic blade from Motor housing.
Fig. 3-1-1
1. Disassemble Roop handle set.
M5x25 Hex socket
head screw (2 pcs.)
Clamp cover B
Roop handle set
Pipe complete
(It is not included in Loop handle set.)
Fig. 3-1-3
3. Remove Housing R by unscrewing seven 4x18 Tapping screws.
4x18 Tapping screw (7 pcs.)
5. To remove Power supply cord unit (long) completely
from the lead wires of Controller complete, cut three
Insulated connectors 5.5-SD at the portion designated
with red lines.
Note: Cut each clamped portion to leave the lead wires
because of the easy reassembling process.
Clamped portions of
Insulated connectors 5.5-SD (3 pcs.)
Clamp 33
Housing R
Roop handle
Clamp 33
4. Disconnect the connectors of Power supply cord unit (long)
from the connectors of Controller complete in Housing L.
Controller complete
6. Disconnect the connector of Power supply cord unit
(short) from the connector of Contoller complete.
7. Remove Strain relief by unscrewing 4x18 Tapping
screw. Power supply cord (short) is removed together
with Corrugated tube.
Connector of Power supply cord (short)
4x18
Tapping
screw
P 10/ 19
Fig. 3-1-2
2. Remove Battery guard
by unscrewing
three M4x12 + Screws.
M4x12 + Screw
(3 pcs.)
Battery
guard
Power supply cord unit
(long)
Strain relief
Power supply cord
unit (short) with
Corrugated tube

Advertisement

Table of Contents
loading

Table of Contents