Download Print this page

Perform Initial Configuration - Edge-Core ECS2100-10T Quick Start Manual

10/28/52-port web-smart pro gigabit ethernet switch 26-port web-smart pro 10g ethernet switch
Hide thumbs Also See for ECS2100-10T:

Advertisement

Available languages

Available languages

Caution:
The earth connection must not be removed
unless all supply connections have been disconnected.
Attention: Le raccordement à la terre ne doit pas être retiré
sauf si toutes les connexions d'alimentation ont été
débranchées.
Caution:
The device must be installed in a restricted-access
location. It should have a separate protective earthing
terminal on the chassis that must be permanently
connected to earth to adequately ground the chassis and
protect the operator from electrical hazards.
Attention: L'appareil doit être installé dans un
emplacement à accès restreint. Il doit comporter une borne
de terre de protection distincte sur le châssis, qui doit être
connectée en permanence à la terre pour assurer une mise
à la terre adéquate du châssis et protéger l'opérateur des
risques électriques.
4. Connect Power
a. Connect AC Power
1
Plug the AC power cord into the socket on the rear of the
switch.
2
Connect the other end of the power cord to an AC power
source. Verify that the external AC power requirements for
the switch can be met as listed below:
ECS2100-10T: AC 100-240 V, 50-60 Hz, 0.5 A
ECS2100-10P: AC 100-240 V, 50-60 Hz, 2.1 A
ECS2100-28T: AC 100-240 V, 50-60 Hz, 0.5 A (Not for China),
AC 100-240 V, 50/60 Hz, 0.5 A
ECS2100-28P: AC 100-240 V, 50-60 Hz, 3.2 A
ECS2100-28PP: AC 100-240 V, 50-60 Hz, 5.8 A
ECS2100-52T: AC 100-240 V, 50/60 Hz,1 A
ECS2110-26T: AC 100-240 V, 50/60 Hz,1 A
Warning:
For the ECS2100-10P, the bottom of the
enclosure is a hot surface. Do not touch!
Attention:
Pour l'ECS2100-10P, le bas du boîtier est une
surface chaude. Ne pas toucher!
Note:
For International use, you may need to change the AC
line cord. You must use a line cord set that has been
approved for the socket type in your country.
b. Connect DC Power to ECS2100-10PE
1
1
Note:
The ECS2100-10PE includes an AC-DC power adapter.
Connect the AC-DC power adapter to the switch and to an
AC power source. The AC-DC adapter provides 54 VDC,
1.67 A of power to the switch.
1
Plug the DC power cable into the socket on the rear of the
switch.
2
Plug the AC-DC power adapter into a nearby AC power
outlet.
5. Verify Switch Operation
1
Verify basic switch operation by checking the system LEDs.
When operating normally, the Power and Diag LEDs should
be on green.

6. Perform Initial Configuration

1
1
Connect a PC to the switch console port using the included
console cable.
2
Configure the PC's serial port: 115200 bps, 8 characters, no
parity, one stop bit, 8 data bits, and no flow control.
3
Log in to the CLI using default settings: Username "admin"
and password "admin."
Note:
For further information on switch configuration, refer
to the Web Management Guide and CLI Reference Guide.
7. Connect Network Cables
1
– 2 –
Quick Start Guide
2
3
2

Advertisement

loading