13 - COMMISSIONING

13.1 - Checks prior to commissioning

■ It is advisable to make a complete sketch of the installation
including the location of the unit and all the components used.
This will be very helpful for maintenance and repairs to the
installation.
■ The following must be verifi ed:
- That the electrical power supply remains constant and that it
corresponds to that featured on the unit data plate.
- That the electric installation has been carried out according
to the electric wiring diagram provided with the unit (consult
the chapter on "Electrical connection").
- The correct connection of the sensors supplied with the unit
(consult the chapter on "Electrical connection").
- That they are no cables close to heat sources.
■ Once the above verifi cations have been carried out, the control
circuit is supplied with voltage by the automatic control switch.
Attention: the compressor crankcase heater must be put under
voltage for 24 hours before starting the compressor.
WICHTIG: WIEDERBEHEIZUNG DER
BEIDER ERSTEN INBETRIEBSETRUNZ ORDER NACH EINER
LANGEN STROMUNTER-BRECHUNG BRINGEN SIE DIE
MASCHINE UNTER SPANNUNG 24 STRUNDERLANG
BEVOR SIE DEN(DIE) KOMPRESSOR(EN) EINSCHALTEN
KOENNEN.
IMPORTANT: CRANKCASE HEATING
FOR THE FIRSTSTART OR AFTER ALONG TIME OUT OF
VOLTAGE PUT THE MACHINE ON LIVE 24 HOURS BEFORE
TO ALLOW THE COMPRESSOR(S) STARTING
IMPORTANT: SURCHAUFFE CARTER D'HUILE
AU PREMIER DÉMARRAGE OU APRÈS UNE ABSCENCE
DE COURANT PROLONGÉE, METTRE LA MACHINE SOUS
T E N S I O N 2 4 H E U R E S A V A N T D ' A U T O R I S E R L E
DÉMARRAGE DU(DES) COMPRESSEUR(S).
IMPORTANTE: RISCALDARE IL CARTER
AL PRIMO AVVIAMENTO U DOPO UNA INTERRUZIONE
PROLUNGATA DELLA ALIMENTAZIONE ELETTRICA,
LASCIARE LA MACCINA SOTTO TENSIONE PER 24 ORE
PRIMA DI AUTORIZZARE L'AVVIAMENTO DEL(DEI)
COMPRESSORE(I).
IMPORTANTE: RECALENTAMIENTO DE
ACEITE DEL CÁRTER
ANTES DEL PRIMER ARRANQUE O DESPUÉS DE UNA
AUSENCIA DE CORRIENTE POR UN LARGO PERIODO DE
TIEMPO, CONVIENE QUE LA UNIDAD ESTÉ CONECTADA
UN MÍNIMO DE 24 HORAS.
Important: As a safety feature to ensure heating of the
crankcase heater, if there is a power cut lasting over 2 hours,
the compressors will be locked. The unit must be powered for
8 hours to unlock them. The graphic terminal will displays the
time remaining until they can be unlocked.
■ All the units are equipped with
scroll type compressors and a
phase control relay. Verify that they
rotate in the correct sense and, if
not, reverse the power wires.
Optionally, these compressors can be fi tted with a semiconductor
compressor softstarter which limits the starting current using
an auto adaptive algorithm.
■ Check the unit operation and verify the safety devices.
66
OLWANNE
DELL'OLIO
SCROLL COMPRESSOR.
CHECK SENSE OF ROTATION
COMPRESSEUR SCROLL.
VÉRIFIER LE SENS DE ROTATION
COMPRESOR SCROLL.
COMPROBAR SENTIDO DE GIRO
Models 50FF/FC 020 to 047:
Fan cover lifted (*)
Access panels to compressor box
Models 50FF 052 to 093:
Fans cover lifted (*)
Models 50FC 052 to 099:
Fans cover lifted (*)
Communication panel
between both circuits
Access panel to compressor
box on circuit 1
(*) For some commissioning and maintenance tasks, it may be
convenient to access the outdoor unit by lifting the cover with
the fan(s). See the lifting procedure in the section entitled "Fans
and air ducts".
Access panels to
compressor box
Access panel to compressor
box on circuit 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

50fc 020-099

Table of Contents