Carrier 50FF 020-093 Installation, Operation And Maintenance Instructions page 9

Package rooftop units
Table of Contents

Advertisement

5 - HANDLING
Important: The centre of gravity is not necessarily in the middle of the unit and the forces applied to the slings are not always identical.
Please consult the weight and the centre of gravity of each model stated in paragraph 7.6.
Confi gurations 1, 2, 3, 4, 6 and 7
A
Confi gurations 5 and 8
A
B
50FF/FC
Assemblies
020 / 028
B1, B2, BF, B3, BX, BP, BA, BT, BB, BW
037 / 040 / 045 / 047
B1, B2, BF, B3, BX, BP, BA, BT, BB, BW
052 / 058 / 062
B1, B2, BF, B3, BX, BP, BT, BW
052 / 058 / 062
R1, R2, RP, RW
052 / 058 / 062
BA, BB
070 / 074 / 086 / 093 / 099
B1, B2, BF, B3, BX, BP, BT, BW
070 / 074 / 086 / 093
R1, R2, RP, RW
070 / 074 / 086 / 093 / 099
BA, BB
After the placing of the unit, it is recommended to remove the grips as they can be a hindrance for maintenance. The grips are fi xed
to the beams using M10 screws (hex. key 17). Put the grips back in case of unit transport (tightening torque of screws 25 Nm).
See detail A
B
C
See detail A
C
D
Confi guration
Important: all rigging points must be used
3000
3000
No. riggings
Unit
points x
width
beam
(mm)
1
2
1750
2
2
1750
3
2
2200
4
2
2200
5
3
2200
6
2
2200
7
2
2200
8
3
2200
Detail A
Expander
Sling
Detail A
Expander
Sling
Stretcher
Distance between riggings points
Beam
(mm)
length
(mm)
A
B
C
2215
300
1600
315
2215
300
1600
315
2985
732,5
1520
732,5
2985
732,5
1520
732,5
2985
732,5
665
855
3639
779,5
2130
729,5
3639
779,5
2130
729,5
3639
779,5
995
1135
D
-
-
-
-
732,5
-
-
729,5
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

50fc 020-099

Table of Contents