Commissioning; Maintenance; Adding Water To Circuit - Carrier 80HMA-M00 Installation, Operation And Maintenance Instructions

Comfort modules hydronic systems
Table of Contents

Advertisement

3.6 Commissioning

Preliminary checks
Check before start up:
The hydronic system connections are appropriately
tightened.
There are no leaks.
The system is completely purged of air.
Warning: Inappropriate air purging can cause damage to the
pumps and Electric Heaters.
The pumps are empty of air and purged before powering
up.
The circuit valves are open and the pumps are set to the
speed determined in the study to provide the necessary
ZDWHU ÀRZ
$GMXVW WKH SXPSV VSHHG ZLWK WKH VHOHFWRU SRVLWLRQV , ,,
,,, ZKHQ SXPS LV QRW HQHUJL]HG
7KH ¿OOLQJ DQG GUDLQ YDOYHV DUH FORVHG
The water circuit pressure is about 100 kPa (1 bar)-
maximum should not exceed 300 kPa.
7KH ¿OWHU V DUH LQVWDOOHG

3.7 Maintenance

Refer to the Safety information.
The equipment must be serviced periodically to maintain
performance and reliability.
The product warranty may be cancelled in case of wrong or
incomplete maintenance.
The user is not authorized to open the unit or remove any
parts.
Any maintenance activity requiring opening of the unit must
EH FDUULHG RXW E\ TXDOL¿HG VHUYLFH SHUVRQQHO
Carry out below operations at least once a year:
‡ Check the expansion vessel
‡ Check parts for wear

3.8 Adding Water to Circuit

7KH XVHU FDQ SHUIRUP WKLV RSHUDWLRQ ZLWKRXW RSHQLQJ WKH XQLW
XVLQJ WKH ¿OOLQJ YDOYH JLYHQ LQ WKH K\GUDXOLF FLUFXLW
The exact operating pressure is 1 bar. If the pressure is
ORZHU WKDQ  EDU ¿OO ZDWHU LQ WKH FLUFXLW 7KH PD[LPXP
operating pressure is 3 bar.
64 80HMA
Electrical connections are appropriately tightened.
Inappropriate tightening can cause running problems
and overheating which may result in serious damage.
All the electrical devices are properly earthed.
No tools or other objects are left inside the unit.
The unit is stable.
Start up
‡ (QVXUH WKDW DOO WKH PHFKDQLFDO K\GUDXOLF DQG HOHFWULFDO
connections are appropriate.
Warning: 'R 127 VZLWFK RQ WKH (OHFWULF +HDWHU FLUFXLW
EUHDNHUV EHIRUH FRPSOHWLQJ WKH HQWLUH FRQ¿JXUDWLRQ DQG WKH
ZDWHU ¿OOLQJ
‡ Turn ON only the boards and the Heat Pump and start the
QHWZRUN FRQ¿JXUDWLRQ DV GHVFULEHG LQ WKLV PDQXDO
‡ 'XULQJ WKH ZDWHU ¿OOLQJ XVH 3DU WR UXQ WKH :DWHU
Pump/s to remove any air left in the circuit.
‡ Once all these operations are completed and the system
LV FRQ¿JXUHGVZLWFK 21 WKH FLUFXLW EUHDNHUV RI WKH
Electrical Heaters.
‡ Check setpoints and operating points
‡ Check safety devices
‡ Check electrical connections for tightness
‡ Check the earth connections
‡ Check for water and refrigerant leaks
‡ Check operation and parameters
‡ &OHDQ WKH ZDWHU ¿OWHU
‡ Check system pressure
‡ Clean the condensate tray
‡ Activate the Security pressure valve (See pictures in
section Integrated Hydraulic Connection  E\ URWDWLQJ
WKH PRYDEOH SDUWV WR UHPRYH GLUW DQG HQVXUH QRUPDO
operation.
$ERYH WKLV YDOXH WKH VDIHW\ SUHVVXUH UHOLHI YDOYH RSHQV
9HULI\ WKDW WKH H[SDQVLRQ YHVVHOV DUH VXI¿FLHQW IRU WKH
application.
:KHQ ¿OOLQJ WKH V\VWHP FRQVLGHU WKDW GXULQJ QRUPDO
+HDWLQJ RSHUDWLRQ WKH SUHVVXUH FDQ LQFUHDVH GXH WR ZDWHU
expansion.

Advertisement

Table of Contents
loading

This manual is also suitable for:

80hma-m0680hma-m0380hma-t0680hma-t09

Table of Contents