TECHNO-GAZ ONYX B 5.0 Technical Manual page 96

Table of Contents

Advertisement

Available languages

Available languages

ENGLISH
OPERATIVE CYCLE
PHASE 1: FIRST VACUUM AND WATER INLET (VACUUM 1)
As a first operation, the autoclave activates the vacuum pump (F) and the status of EV5
change in ON. Thanks to the change of EV3 in ON, the air is suctioned from the chamber of
sterilization. During the phase of reaching of vacuum, EV6 activates and deactivates for
cooling and for cleaning the surface of the membranes of the vacuum pump (the average
time of this phase is about 2 / 3 minutes).
EV2
EV3
EV4
EV5
EV6
EV7
ON (3 times at intervals -0.2bar /
OFF
ON
OFF
ON
OFF
-0.4bar / -0.6bar)
Once the negative pressure of -0.90 bar (-0.86 bar for the 24L) is reached, EV3 closes (off),
the vacuum pump stops working and the valve EV4 opens (on) to enable the inlet of water
into the chamber from the clean water tank (E). The quantity of water is read by the
flowmeter; when the correct quantity of water is reached, EV4 closes (off).
EV2
EV3
EV4
EV5
EV6
EV7
OFF
OFF
ON
ON
OFF
OFF
WATER TABLE INLET
Quantity of water for phase : ~160 / 270 ml.
Total quantity of water : ~160 / 270 ml.
19

Advertisement

Table of Contents
loading

Related Products for TECHNO-GAZ ONYX B 5.0

This manual is also suitable for:

Onyx b 8.0

Table of Contents