Chapter 5: Assemble And Position Gateway - Fluke 3562 Getting Started Manual

Screening vibration sensor system
Table of Contents

Advertisement

Available languages

Available languages

When properly powered, the "wake-up" light at the top of the sensor flashes red
once every 60 seconds.

Chapter 5: Assemble and position gateway

1. Supplied gateway parts include: the gateway in a rugged housing; an antenna for
machine health monitoring; a WiFi antenna for connection to the internet; an LTE
antenna for connection to the internet; power cords
2. Screw on the antennas to the gateway: (1) Evernet (sensor to gateway); (2) WiFi
(backhaul); (3) LTE (backhaul)
3. Identify location to mount the gateway. The location must be exposed and with a
guaranteed source of power, and must not interfere with plant operation.
NOTE: Do not mount the gateway permanently before data is monitored in
LIVE-Asset™ Portal.
4. Power the gateway. Use the mains supply or the 12 V DC / 24 V DC adapter or
Power over Ethernet (PoE).
Observe safety information regarding risk of injury from electric shock on page
10.
13
Mount Components

Advertisement

Table of Contents
loading

This manual is also suitable for:

3504

Table of Contents