When properly powered, the "wake-up" light at the top of the sensor flashes red
once every 60 seconds.
Chapter 5: Assemble and position gateway
1. Supplied gateway parts include: the gateway in a rugged housing; an antenna for
machine health monitoring; a WiFi antenna for connection to the internet; an LTE
antenna for connection to the internet; power cords
2. Screw on the antennas to the gateway: (1) Evernet (sensor to gateway); (2) WiFi
(backhaul); (3) LTE (backhaul)
3. Identify location to mount the gateway. The location must be exposed and with a
guaranteed source of power, and must not interfere with plant operation.
NOTE: Do not mount the gateway permanently before data is monitored in
LIVE-Asset™ Portal.
4. Power the gateway. Use the mains supply or the 12 V DC / 24 V DC adapter or
Power over Ethernet (PoE).
Observe safety information regarding risk of injury from electric shock on page
10.
13
Mount Components