Preparing The Graphics Card; Removing The Stock Cooler; Msi Geforce Rtx 4090 Suprim X 24G - EK-Quantum Vector2 Trio RTX 4090 D-RGB ABP Set User Manual

Gpu water block
Hide thumbs Also See for Vector2 Trio RTX 4090 D-RGB ABP Set:
Table of Contents

Advertisement

PREPARING THE GRAPHICS CARD

RETENTION BRACKET
SAVE FOR LATER STEPS

REMOVING THE STOCK COOLER

MSI GeForce RTX 4090 Suprim X 24G

STEP 1
First, remove twelve (12) screws
from the backside of the Stock cooler
(using a Phillips head screwdriver)
and detach the backplate. After
removing the backplate, additional
(4) blue-marked screws must be
removed to detach the retention
STEP 1
bracket.
STEP 2
Five (5) screws must be removed to detach the I/O Bracket. Save the
I/O Bracket and marked screw for later use.
Lastly, one (1) blue-marked screw must be removed. Unplug the
connectors and remove the stock cover from the GPU PCB.
For this step, you will need:
Phillips Head Screwdriver
I/O BRACKET
STEP 2
- 7 -
Important! Before starting, make sure to have a clean, flat
surface to work on. It is recommended to put foam or soft
material to lay the graphics card on.
For this step, you will need:
Phillips Head Screwdriver

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Vector2 Trio RTX 4090 D-RGB ABP Set and is the answer not in the manual?

This manual is also suitable for:

3831109902462

Table of Contents