Built-In Installation Of Two Or More Appliances - Bertazzoni Professional Series Installation Manual

Hide thumbs Also See for Professional Series:
Table of Contents

Advertisement

Available languages

Available languages

5. INSTALLATION
5.2 Built-in installation of two or more
appliances
> Required accessory to be ordered separately:
central connection kit
Special side profiles and plastic covering
frames are provided for closing gaps
between the appliance and the adjacent
cabinets.
Operate as follows:
> Position the appliances in front of the installation
area, leaving enugh space to operate at their back [ 1 ].
IMPORTANT: the appliances must be level with
one another.
1 – Attach both units to each other at the front
using the 5 white plastic brackets to hold the units
together.
2 – Adjust the units in the back, so that the side
panels are perfectly parallel to each other. There
are visual cues that will aid with alignment.
3 – The gap ( C ) between the units must be the
same at the back and top. Measure the gap on all
edges and adjust if not equal [ 2 ].
4 – Once the gap is consistent on all edges, secure
the brackets. If the gap between the units is not
even, doors will not align properly.
Gap measurements vary according to the types of
units installed. Please refer to the table below for
correct gap measurements.
Distance between units (A+B)
C
18"
24"
7/8"
15/16"
18"
(22 mm)
(23,5 mm)
15/16"
1"
24"
(23,5 mm)
(25 mm)
B
1"
1"
30"
(24,5 mm)
(26 mm)
1"
1 1/16"
36"
(25,5 mm)
(27 mm)
1
16
A
30"
36"
1"
1"
(24,5 mm)
(25,5 mm)
1"
1 1/16"
(26 mm)
(27 mm)
1 1/16"
1 1/8"
(27 mm)
(28 mm)
1 1/8"
1 1/8"
(28 mm)
(29 mm)
2
A
B
3
4
5
C
C

Advertisement

Table of Contents
loading

Table of Contents