Page 1
October 26, 2022 ASTM E2779 Standard Test Method for Determining Particulate Matter Emissions from Pellet Heaters (EPA ALT-146) Contact: Mr. Robert Beck Thelin Hearth Products, Inc. 63 Lexalt Dr. Carson City, NV 89706 (775)-241-2586 ext. 105 Prepared by: Aaron Kravitz, Testing Supervisor 11785 SE Highway 212 –...
Project # 22-827 Model: Parlor Affidavit PFS-TECO was contracted by Thelin Hearth Products, Inc. to provide testing services for the Parlor Pellet-Fired Room Heater per ASTM E2779, Determining PM Emissions from Pellet Heaters. All testing and associated procedures were conducted at PFS-TECO’s Portland Laboratory on 10/6/2022 and 10/10/2022.
Project # 22-827 Model: Parlor Introduction Thelin Hearth Products, Inc. of Carson City, NV, contracted with PFS-TECO to perform EPA certification testing on Parlor Pellet-Fired Room Heater. All testing was performed at PFS-TECO’s Portland Laboratory. Testing was performed by Mr. Aaron Kravitz.
Project # 22-827 Model: Parlor Test Procedures and Equipment All Sampling and analytical procedures were performed by Aaron Kravitz. All procedures used are directly from ASTM E2779 and ASTM E2515. See the list below for equipment used. See Appendix C submitted with this report for calibration data. Equipment List: Equipment ID# Equipment Description...
Higher Heating Values efficiency of 81% and a CO emission rate of 0.11 g/min. The calculated first hour particulate emission rate was 1.1 g/hr. The Thelin Hearth Products, Inc. Model Parlor Pellet-Fired Room Heater meets the 2020 PM emission standard of ≤...
Project # 22-827 Model: Parlor Test Run Narrative Run 1 Run 1 was performed on 10/6/2022 as an attempted integrated test run per EPA ALT- 146/ ASTM E2779. The overall test duration was 360 minutes. The particulate emissions rate for the integrated test run was 1.3 g/hr. The run had an overall HHV efficiency of 82%.
Project # 22-827 Model: Parlor Test Conditions Summary Testing conditions for all runs fell within allowable specifications of ASTM E2779 and ASTM E2515. A summary of facility conditions, fuel burned, and run times is listed below. Average Preburn Relative Test Fuel Test Fuel Test Run Ambient (°F)
Project # 22-827 Model: Parlor Appliance Description Model(s): Parlor Appliance Type: Pellet-Fired Room Heater Air Introduction System: A variable speed combustion fan forces air into the firebox through holes in the bottom of the firepot. Combustion Control: A control panel on the side of the unit is used to select burn rates, which are varied by automatic modulation of the combustion fan and feed system.
Page 12
Project # 22-827 Model: Parlor Appliance Front Appliance Left Page | 12...
Project # 22-827 Model: Parlor Test Fuel Properties Test fuel used was Bear Mountain Wood Pellet Fuel, a PFI Certified Premium Pellet Brand. A sample of pellets was sent to Twin Ports Testing for analysis, see report below. Page | 14...
Project # 22-827 Model: Parlor Sampling Locations and Descriptions Sample ports are located 16.5 feet downstream from any disturbances and 2 feet upstream from any disturbances. Flow rate traverse data was collected 8 feet downstream from any disturbances and 4 feet upstream from any disturbances. (See below).
Project # 22-827 Model: Parlor Sampling Methods ASTM E2515 was used in collecting particulate samples. The dilution tunnel is 12 inches in diameter. All sampling conditions per ASTM E2515 were followed. No alternate procedures were used. Analytical Methods Description All sample recovery and analysis procedures followed ASTM E2515 procedures. At the end of each test run, filters, O-Rings and probes were removed from their housings, dessicated for a minimum of 24 hours, and then weighed at 6 hour intervals to a constant weight per ASTM E2515-11 Section 10.
Project # 22-827 Model: Parlor List of Appendices The following appendices have been submitted electronically in conjunction with this report: Appendix A – Test Run Data, Technician Notes, and Sample Analysis Appendix B – Labels and Manuals Appendix C –Equipment Calibration Records Appendix D –...
Page 20
Conditioning Data.xlsm Pre-Conditioning Data Client: Sierra Job #: 22-827 Model: Parlor Tracking #: Date(s): 9/24/22 - 10/6/22 Technician: Notes: Indicate initial air setting and any changes in in setting during Catalyst Exit Elapsed Time Flue (°F) conditioning, as well as weight and average moisture content of all fuel (°F) (hrs) additions.
Page 21
Run 1 Emissions.xlsm Equations and Sample Calculations – ASTM E2779 & E2515 Client Thelin Model: Parlor Tracking #: Run: Equations used to calculate the parameters listed below are described in this appendix. Sample calculations are provided for each equation. The raw data and printout results from a sample run are also provided for comparison to the sample calculations.
Page 22
Run 1 Emissions.xlsm – Weight of test fuel burned during test run, dry basis, kg ASTM E2779 equation (1) = (M )(100/(100 + FM)) Where, average fuel moisture of test fuel, % dry basis weight of test fuel in hopper at start of test run, wet basis, kg weight of test fuel in hopper at end of test run, wet basis, kg Sample Calculation: FM = 3.78 %...
Page 23
Run 1 Emissions.xlsm – Weight of test fuel burned during test run segment i , dry basis, kg BSidb ASTM E2779 equation (2) = (MS )(100/(100 + FM)) BSidb Siwb ESiwb Where, weight of test fuel in hopper at start of test run segment i , wet basis, kg SSiwb weight of test fuel in hopper at end of test run segment i , wet basis, kg ESiwb...
Page 24
Run 1 Emissions.xlsm BR – Average dry burn rate over full integrated test run, kg/hr ASTM E2779 equation (3) 60 M θ Where, θ = Total length of full integrated test run, min Sample Calculation: = 8.30 θ = 360 60 x 8.3 1.38 kg/hr...
Page 25
Run 1 Emissions.xlsm – Average dry burn rate over test run segment i , kg/hr ASTM E2779 equation (4) 60 M BSidb θ Where, Total length of test run segment i , min θ Sample Calculation (from medium burn rate segment): 3.18 BSidb θ...
Page 26
Run 1 Emissions.xlsm – Average gas velocity in the dilution tunnel, ft/sec ASTM E2515 equations (9) Where: Adjustment factor for center of tunnel pitot tube strav , ASTM E2515 Equation (1) placement, Fp = scent Dilution tunnel velocity calculated after the multi-point pitot traverse at the center, ft/sec scent...
Page 27
Run 1 Emissions.xlsm – Average gas flow rate in dilution tunnel, dscf/hr ASTM E2515 equation (3) Where: 3600 Conversion from seconds to hours (ASTM method uses 60 to convert in minutes) Water vapor in gas stream, proportion by volume; assume 2% Cross sectional area of dilution tunnel, ft Standard absolute temperature, 528 °R Absolute average gas static pressure in dilution tunnel, = P...
Page 28
Run 1 Emissions.xlsm – Volume of Gas Sampled Corrected to Dry Standard Conditions, dscf m(std) ASTM E2515 equation (6) Where: 17.64 °R/in. Hg Volume of gas sample measured at the dry gas meter, dcf Dry gas meter calibration factor, dimensionless Barometric pressure at the testing site, in.
Page 29
Run 1 Emissions.xlsm – Total Particulate Matter Collected, mg ASTM E2515 Equation (12) Where: mass of particulate matter from probe, mg mass of particulate matter from filters, mg mass of particulate matter from filter seals, mg Sample Calculation: Using equation for Train A (first hour): Using equation for Train A (remainder): Train A Aggregate = 4.5 mg...
Page 30
Run 1 Emissions.xlsm - Concentration of particulate matter in tunnel gas, dry basis, corrected to standard conditions, g/dscf ASTM E2515 equation (13) Where: Constant, 0.001 g/mg Total mass of particulate matter collected in the sampling train, mg Volume of gas sampled corrected to dry standard conditions, dscf m(std) Sample calculation: For Train A:...
Page 31
Run 1 Emissions.xlsm – Total Particulate Emissions, g ASTM E2515 equation (15) − Where: Concentration of particulate matter in tunnel gas, g/dscf Concentration particulate matter room air, g/dscf Average dilution tunnel gas flow rate, dscf/hr θ Total time of test run, minutes Sample calculation: For Train A = ( 0.000091 -...
Page 32
Run 1 Emissions.xlsm PR - Proportional Rate Variation ASTM E2515 equation (16) Where: θ = Total sampling time, min θ = Length of recording interval, min = Volume of gas sample measured by the dry gas meter during the “ith” time interval, dcf = Volume of gas sample as measured by dry gas meter, dcf = Average gas velocity in the dilution tunnel during the "ith"...
Page 33
Run 1 Emissions.xlsm – Average particulate emissions for full integrated test run, g/hr ASTM E2779 equation (5) = 60 (E /θ) Where, = Total particulate emissions, grams θ = Total length of full integrated test run, min Sample Calculation: (Dual train average) = 8.99 g θ...
Page 34
Run 1 Emissions.xlsm – Average particulate emission factor for full integrated test run, g/dry kg of fuel burned ASTM E2779 equation (6) Where, = Total particulate emissions, grams = Weight of test fuel burned during test run, dry basis, kg Sample Calculation: (Dual train average) = 8.99 g...
Page 35
Twin Ports Testing, Inc. 1301 North 3rd Street Superior, WI 54880 715-392-7114 800-373-2562 715-392-7163 www.twinportstesting.com Report No: USR:W222-0658-01 Issue No: Analytical Test Report PFS-TECO Client: Signed: 11785 SE Hwy 212 Ste 305 Clackamas, OR 97015 Sebastian Button Attention: Amber Anderson Chemist PO No: 10/17/2022...
Page 36
PELLET TEST DATA PACKET ASTM E2779/E2515 Run 1 Data Summary Client: Thelin Model: Parlor Job #: 22-827 Tracking #: Test Date: 10/6/2022 10/26/2022 Techician Signature Date PFS-TECO...
Page 37
Run 1 Emissions.xlsm TEST RESULTS - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/6/2022 Burn Rate Summary High Burn Rate (dry kg/hr) 1.98 Medium Burn Rate (dry kg/hr) 1.59 Medium Burn Rate Target: <...
Page 38
Run 1 Emissions.xlsm Overall Pellet Test Efficiency Results Manufacturer: Thelin Model: Parlor Date: 10/06/22 Run: 1 Control #: 22-827 Test Duration: 360 Output Category: Integrated Test Results in Accordance with CSA B415.1-09 HHV Basis LHV Basis Overall Efficiency 82.0% 88.8% Combustion Efficiency 99.5%...
Page 39
Run 1 Emissions.xlsm Max Burn Rate Segment Efficiency Results Manufacturer: Thelin Model: Parlor Date: 10/06/22 Run: 1 Control #: 22-827 Test Duration: 60 Output Category: Maximum Test Results in Accordance with CSA B415.1-09 HHV Basis LHV Basis Overall Efficiency 80.1% 86.7%...
Page 40
Run 1 Emissions.xlsm Medium Burn Rate Segment Efficiency Results Manufacturer: Thelin Model: Parlor Date: 10/06/22 Run: 1 Control #: 22-827 Test Duration: 120 Output Category: Medium Test Results in Accordance with CSA B415.1-09 HHV Basis LHV Basis Overall Efficiency 81.5% 88.3%...
Page 41
Run 1 Emissions.xlsm Minimum Burn Rate Segment Efficiency Results Manufacturer: Thelin Model: Parlor Date: 10/06/22 Run: 1 Control #: 22-827 Test Duration: 180 Output Category: Minimum Test Results in Accordance with CSA B415.1-09 HHV Basis LHV Basis Overall Efficiency 83.4% 90.3%...
Page 42
Run 1 Emissions.xlsm DILUTION TUNNEL & MISC. DATA - ASTM E2779 / E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Test Start Time: 8:19 Date: 10/6/2022 High Burn End Time (min): Medium Burn End Time (min):...
Page 43
Run 1 Emissions.xlsm PELLET STOVE PREBURN DATA - ASTM E2779 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: Technician: Date: 10/6/2022 Recording Interval (min): Run Time (min): Average: -0.062 Flue Draft (in Elapsed Time Scale Weight Change Flue (°F)
Page 45
Run 1 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 1 Technician: AK Date: 10/6/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 46
Run 1 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 1 Technician: AK Date: 10/6/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 47
Run 1 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 1 Technician: AK Date: 10/6/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 48
Run 1 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 1 Technician: AK Date: 10/6/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 49
Run 1 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 1 Technician: AK Date: 10/6/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 50
Run 1 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 1 Technician: AK Date: 10/6/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 51
Run 1 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 1 Technician: AK Date: 10/6/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 52
Run 1 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 1 Technician: AK Date: 10/6/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 53
Run 1 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 1 Technician: AK Date: 10/6/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 54
Run 1 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 1 Technician: AK Date: 10/6/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 55
Run 1 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 1 Technician: AK Date: 10/6/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 56
Run 1 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/6/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 57
Run 1 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/6/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 58
Run 1 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/6/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 59
Run 1 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/6/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 60
Run 1 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/6/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 61
Run 1 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/6/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 62
Run 1 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/6/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 63
Run 1 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/6/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 64
Run 1 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/6/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 65
Run 1 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/6/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 66
Run 1 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/6/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 67
Run 1 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/6/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 68
Run 1 Emissions.xlsm LAB SAMPLE DATA - ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: Technician: AK Date: 10/6/2022 Sample ID Tare, mg Total, mg Final, mg Catch, mg 247.0 250.5 A - 1st Hour...
Page 69
ASTM E2779 Wood Heater Run Sheets Client: Thelin Job Number: 22-827 Tracking #: 128 Model: Parlor Run Number: 1 Test Date: 10/6/2022 Pellet Heater Control Settings High Burn Rate Settings: Setting: High, trim 1:00 Medium Burn Rate Settings: Setting: Med, trim 1:00...
Page 70
PELLET TEST DATA PACKET ASTM E2779/E2515 Run 2 Data Summary Client: Thelin Model: Parlor Job #: 22-827 Tracking #: Test Date: 10/10/2022 10/26/2022 Techician Signature Date PFS-TECO...
Page 71
Run 2 Emissions.xlsm TEST RESULTS - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/10/2022 Burn Rate Summary High Burn Rate (dry kg/hr) 1.90 Medium Burn Rate (dry kg/hr) 1.41 Medium Burn Rate Target: <...
Page 72
Run 2 Emissions.xlsm Overall Pellet Test Efficiency Results Manufacturer: Thelin Model: Parlor Date: 10/10/22 Run: 2 Control #: 22-827 Test Duration: 360 Output Category: Integrated Test Results in Accordance with CSA B415.1-09 HHV Basis LHV Basis Overall Efficiency 81.5% 88.2% Combustion Efficiency 99.5%...
Page 73
Run 2 Emissions.xlsm Max Burn Rate Segment Efficiency Results Manufacturer: Thelin Model: Parlor Date: 10/10/22 Run: 2 Control #: 22-827 Test Duration: 60 Output Category: Maximum Test Results in Accordance with CSA B415.1-09 HHV Basis LHV Basis Overall Efficiency 79.6% 86.2%...
Page 74
Run 2 Emissions.xlsm Medium Burn Rate Segment Efficiency Results Manufacturer: Thelin Model: Parlor Date: 10/10/22 Run: 2 Control #: 22-827 Test Duration: 120 Output Category: Medium Test Results in Accordance with CSA B415.1-09 HHV Basis LHV Basis Overall Efficiency 81.1% 87.8%...
Page 75
Run 2 Emissions.xlsm Minimum Burn Rate Segment Efficiency Results Manufacturer: Thelin Model: Parlor Date: 10/10/22 Run: 2 Control #: 22-827 Test Duration: 180 Output Category: Minimum Test Results in Accordance with CSA B415.1-09 HHV Basis LHV Basis Overall Efficiency 83.0% 89.9%...
Page 76
Run 2 Emissions.xlsm DILUTION TUNNEL & MISC. DATA - ASTM E2779 / E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Test Start Time: 8:47 Date: 10/10/2022 High Burn End Time (min): Medium Burn End Time (min):...
Page 77
Run 2 Emissions.xlsm PELLET STOVE PREBURN DATA - ASTM E2779 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: Technician: Date: 10/10/2022 Recording Interval (min): Run Time (min): Average: -0.053 Flue Draft (in Elapsed Time Scale Weight Change Flue (°F)
Page 79
Run 2 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 2 Technician: AK Date: 10/10/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 80
Run 2 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 2 Technician: AK Date: 10/10/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 81
Run 2 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 2 Technician: AK Date: 10/10/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 82
Run 2 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 2 Technician: AK Date: 10/10/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 83
Run 2 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 2 Technician: AK Date: 10/10/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 84
Run 2 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 2 Technician: AK Date: 10/10/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 85
Run 2 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 2 Technician: AK Date: 10/10/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 86
Run 2 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 2 Technician: AK Date: 10/10/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 87
Run 2 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 2 Technician: AK Date: 10/10/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 88
Run 2 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 2 Technician: AK Date: 10/10/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 89
Run 2 Emissions.xlsm BOX A TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: 2 Technician: AK Date: 10/10/2022 Fuel Weight (lb) Temperature Data (°F) Particulate Sampling Data Dilution...
Page 90
Run 2 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/10/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 91
Run 2 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/10/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 92
Run 2 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/10/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 93
Run 2 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/10/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 94
Run 2 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/10/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 95
Run 2 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/10/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 96
Run 2 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/10/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 97
Run 2 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/10/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 98
Run 2 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/10/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 99
Run 2 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/10/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 100
Run 2 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/10/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 101
Run 2 Emissions.xlsm BOX B TEST DATA - ASTM E2779 / ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: Run #: Technician: Date: 10/10/2022 Particulate Sampling Data Flue Gas Data Meter Gas Meter Orifice dH Flue Draft...
Page 102
Run 2 Emissions.xlsm LAB SAMPLE DATA - ASTM E2515 Client: Thelin Job #: 22-827 Model: Parlor Tracking #: 128 Run #: Technician: AK Date: 10/10/2022 Sample ID Tare, mg Total, mg Final, mg Catch, mg 245.4 247.8 A - 1st Hour...
Page 104
PARLOUR PELLET 3000 Pellet Heater Owner's Manual Installation and Operating Instructions Made in the USA by: Please read this entire manual before installation. Save these instructions. SAFETY NOTICE ▪ HEATER MUST BE PROPERLY INSTALLED AND MAINTAINED OR A HOUSE FIRE MAY RESULT.
Page 105
PARLOUR PELLET 3000 PELLET HEATER INDEX OF CONTENTS Appendix A, 22 Hopper Appendix B, 23 clean out, 15 Appendix C, 25 filling, 11 Appendix D, 26 Installation, 7 Appendix E, 27 battery, 13 Battery clean out tee, 8 installation, 13...
Page 108
PARLOUR PELLET 3000 PELLET HEATER Congratulations on your purchase of Thelin™ Hearth Products Parlour™ 3000 pellet stove! In this manual you will find information on stove specifications, installation instructions, operating guide, how to perform scheduled maintenance, a troubleshooting guide, a detailed parts list and associated diagrams. Also included is your warranty information.
Page 109
The following should be considered when installing The Parlour Pellet 3000 Heater has been designed any solid fuel appliance: and approved for burning wood pellet fuel only.
Page 110
All outside air hook-ups for mobile or modular homes require Thelin Hearth Products’ outside air kit — NO EXCEPTIONS! CAUTION: Do not connect this unit to a chimney flue serving another appliance.
Page 111
PARLOUR PELLET 3000 PELLET HEATER MOBILE OR MODULAR HOME Mobile or modular home installation must be in accordance with the Manufactured Home Safety Standard (HUD) CFR3280, Part 24. WARNING: DO NOT INSTALL IN SLEEPING ROOM. CAUTION: THE SRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR, WALL AND CEILING/ROOF MUST BE MAINTAINED.
Page 112
PARLOUR PELLET 3000 PELLET HEATER INSTALLATION Attachment and securing of the exhaust venting system to the product and to each adjoining sections: All joints for the connector pipe should be fastened with three screws. If vented horizontally, joints should be made gas tight (see Item 9b).
Page 113
PARLOUR PELLET 3000 PELLET HEATER When installing the exhaust vent into an existing chimney (see Appendix D), a clean out tee must be installed behind the heater before going up into the chimney. This is necessary in order to remove the fly ash accumulation.
Page 114
4. Make sure all wiring is complete before TEE WITH REMOVABLE plugging the Parlour back into the wall outlet. CAP FOR CLEAN-OUT 5. You have the option to have the thermostat run the stove either ON/OFF or Hi/Low.
Page 115
PARLOUR PELLET 3000 PELLET HEATER Outside Air Hook-Up Rotated and enlarged view of plate bottom Fuse Holder: To remove fuse, push cap in and turn counter-clockwise FIGURE 10...
Page 116
CAUTION: Fuel hopper lid must be closed before operating the unit. DO NOT OVERFILL THE The Parlour E.I. has automatic ignition. As a result HOPPER! The Parlour will hold approximately 40 you simply plug in the stove, fill with pellets and pounds of pellets.
Page 117
PARLOUR PELLET 3000 PELLET HEATER carefully and make sure you use the built in 2. In the "Low" position, the Parlour will feed thermostat terminals on the bottom of the stove. approximately 1 to 1.5 pounds of pellets per (See Figure 10) We recommend you run the heater hour.
Page 118
110 AC wall bottom ring. outlet. Do not use extension cords. The 2. The Parlour Pellet 12V back-up can be trickle charge will not recharge a low or purchased as an option and includes the...
Page 119
DC power only. The stove can be lit manually mandatory for the warranty to remain in effect. with an approved starter material. Call Thelin if you need help with manual lighting. The following procedures should be studied carefully and performed regularly as indicated.
Page 120
"Clean" mode on 5. Polishing the Gold and Chrome: All gold and the control dial. chrome plating used on the Parlour can be Fly ash can also accumulate in the vent cleaned with a soft cloth and non-abrasive pipe.
Page 121
Thelin Hearth. 3. Problem: The fire was burning well and then it began to overfeed pellets and started backing up into the pellet feed chute, smothering the fire. This Parlour Pellet Heater has been safety tested by Warnock Hersey Test...
Page 122
PARLOUR PELLET 3000 PELLET HEATER Solution: If the heater emits smoke during a 7. Problem: I turned off the switch and the heater power failure and you have frequent power continued running. failures, then we suggest you purchase the Solution: This is normal. The exhaust blower battery back-up system.
Page 123
PARLOUR PELLET 3000 PELLET HEATER FIGURE 15 – REPLACEMENT PARTS LIST 16...
Page 126
PARLOUR PELLET 3000 PELLET HEATER FIGURE 19 – ROUTINE STOVE CLEAN OUT AND MAINTENANCE The following is a step-by-step procedure to clean out and maintain your pellet stove. Stove must be shut off and completely cold before performing this maintenance.
Page 127
Your Thelin Pellet Stove is equipped with a blocked flue/high temp safety sensor that will shut the stove off if there is a down draft, blocked flue, or high temperature condition.
Page 129
PARLOUR PELLET 3000 PELLET HEATER APPENDIX B – OUTSIDE AIR HOOK-UP...
Page 130
PARLOUR PELLET 3000 PELLET HEATER APPENDIX C – FINE TUNING Because of the variability of pellets (i.e., length 2. The Fan Trim Pot Adjustment is located on thickness, density, quality of sawdust), you the circuit board (see Figure 17). Please note might have to—from time to time—fine tune...
Page 131
PARLOUR PELLET 3000 PELLET HEATER APPENDIX D – CHIMNEY INSTALLATION CRITERIA CHIMNEY INSTALLATION 1. A clean out tee is required on both installations (see items 1 and 6 in illustration). 2. Four-inch pellet vent pipe is required on both chimney and fireplace installs (see item 2 in illustration).
Page 132
PARLOUR PELLET 3000 PELLET HEATER APPENDIX E – REPLACEMENT OF IGNITER...
Page 133
Thelin Hearth Products, Warranty Division, Carson City, NV 89706. Returned part or product will be repaired or replaced at Thelin Hearth Products’ option and will be returned to you freight prepaid as soon as practical, but not later than 30 days after receipt.
Page 134
PARLOUR PELLET 3000 PELLET HEATER Thelin Hearth Products, Inc. 63 Laxalt Dr. Carson City, NV 89706 www.thelinco.com...
Page 135
ASTM E2779 Wood Heater Run Sheets Client: Thelin Job Number: 22-827 Tracking #: 128 Model: Parlor Run Number: 2 Test Date: 10/10/2022 Pellet Heater Control Settings High Burn Rate Settings: Setting: High Trim Pot: 9:00 Medium Burn Rate Settings: Setting: Med...
Page 136
Dry Gas Meter Calibration Meter Manufacturer: Apex Model: XC-60 Lab ID #: Serial #: 1902130 Calibration Date: 7/25/2022 Calibration Expiration: 1/25/2023 Barometric Pressure: 29.74 in. Hg Reference Standard DGM Unit Under Test Previous Calibration Manufacturer: Apex Date 3/21/2022 γ Factor: Model: SK25DA 1.015 Lab ID#: 47...
Page 137
Pressure Gauge Calibration Work Sheet Gauge Manufacturer: Apex Maximum Range (inH Instrument ID #: 053 (dP) Calibration Date: 7/26/2022 Calibration Expiration: 7/26/2023 Barometric Pressure: 29.74 in. Hg Reference Standard Gauge Manufacturer: Dwyer Model: 475-000 Instrument ID#: 76 Calibration Expiration Date: 8/3/2022 Reference Gauge Pressure Gauge Difference...
Page 138
Emissions Sampling System Thermocouple Calibration Check Calibration based on NIST Monograph 175 per ASTM E2515-11 All thermocouples are type “K” Date: 07/25/2022 Sampling System ID Numbers: 053/054 Performed By: S. Button Calibration Instrument ID Number: Thermocouple Location Reference Acceptable Temperature Error (F) Catalyst Flue...
Page 139
Dry Gas Meter Calibration Meter Manufacturer: Apex Model: XC-60 Lab ID #: Serial #: 1902133 Calibration Date: 7/25/2022 Calibration Expiration: 1/25/2023 Barometric Pressure: 29.70 in. Hg Reference Standard DGM Unit Under Test Previous Calibration Manufacturer: Apex Date 3/21/2022 γ Factor: Model: SK25DA 0.985 Lab ID#: 47...
Page 140
Pressure Gauge Calibration Work Sheet Gauge Manufacturer: Apex Maximum Range (inH Instrument ID #: 054 (dP) Calibration Date: 7/26/2022 Calibration Expiration: 7/26/2023 Barometric Pressure: 29.74 in. Hg Reference Standard Gauge Manufacturer: Dwyer Model: 475-000 Instrument ID#: 76 Calibration Expiration Date: 8/3/2022 Reference Gauge Pressure Gauge Difference...
Page 141
Dry Gas Meter Calibration Meter Manufacturer: Apex Model: XC-50-DIR Lab ID #: Serial #: A2204292 Calibration Date: 7/25/2022 Calibration Expiration: 1/25/2023 Barometric Pressure: 29.77 in. Hg Reference Standard DGM Unit Under Test Previous Calibration Manufacturer: Apex Date γ Factor: Model: SK25DA 1.000 Lab ID#: 47 Allowable Deviation (±5%):...
Page 142
Dry Gas Meter Calibration Meter Manufacturer: Apex Model: Apex-AK-600 Lab ID #: Serial #: 810016 Calibration Date: 7/27/2022 Calibration Expiration: 7/27/2023 Barometric Pressure: 29.86 in. Hg Reference Standard DGM Unit Under Test Previous Calibration Manufacturer: Apex Date 10/8/2021 γ Factor: Model: SK25DA 0.997 Lab ID#: 47...
Page 143
JJ Calibrations, Inc. Certificate of Calibration 7724 SE Aspen Summit Drive Portland, OR 97266-9217 743892 Certificate Number: Phone 503.786.3005 FAX 503.786.2994 PFS TECO 11785 SE Hwy 212 1033 Suite 305 03/08/2021 Order Date: Clackamas, OR 97015 0723.01 Authorized By: Calibration Property #: Calibrated on: 03/18/2021...
Page 150
Bulletin D-57 Model 1430 Microtector Electronic Point Gage ® Installation and Operating Instructions Model 1430 Microtector ® Portable • Three-point mounting, dual leveling Electronic Point Gage combines mod- adjustment, and circular level vial assure rapid setup ern, solid-state integrated circuit elec- •...
Page 151
PRESSURE FLUID LEVEL Microtector Gage ® Precision Pressure Measurement On indication of contact, the operator stops The Microtector ® Gage combines the time- lowering the point and reads the micrometer proven principles of the Hook Gage type which indicates one half the applied pressure. manometer and modern solid-state integrat- By interpolating eight divisions (each being ed circuit electronics.
Page 152
After making contact, turn the point out of the Fluid Level fluid by turning the micrometer barrel counter- Level the gage by adjusting the two front lev- clockwise to a reading of .010 or more. Again, eling screws (Item 8 on drawing) until the bub- watch the meter and, this time, lower the ble in the spirit level is centered in the small point by turning the micrometer barrel.
Page 153
When the readings are complete, the pres- (2) If the meter operation continues to be sure should be removed and the zero setting sluggish, replace the size AA, 1.5 volt battery. of Microtector ® Gage rechecked. Any change (Replace the battery at least once a year to in the zero position will indicate inaccurate avoid deterioration of battery and damage to readings.
Need help?
Do you have a question about the Parlour and is the answer not in the manual?
Questions and answers