Graco Accu-Shot 233807 Instructions Manual page 6

Electronic grease meter
Hide thumbs Also See for Accu-Shot 233807:
Table of Contents

Advertisement

Installation
7. Apply thread sealant to the male threads of the hose
fitting (f), thread the hose fitting into the fitting (2) of
the Accu-Shot, and tighten firmly. (F
NOTE: Let the sealant cure to the manufacturer's rec-
ommendations before the system is pressurized with
grease.
2
F
. 2
IG
8. Open all dispense position shut-off valves, and start
the pump to pressurize the system. See Operation
section for proper operation of meter (page 7).
9. To ensure dispensing accuracy, purge all air from
the fluid lines and the dispense valve before using.
6
. 2)
IG
f
Grease Dispenser Components
Refer to F
. 3 for the following.
IG
Key:
J
Accu-Shot grease extension tube
K
Measurement and recording of grease delivered by
internal oval gear metering chamber and control
electronics
L
The delivery control valve is activated by a steel lever
provided with a safety lock. It is designed to control the
flow of grease at high pressure.
M
The valve grip contains the electronic power supply
battery housing.
N
Display
P
Hose connection fitting
R
Dispensing lever control knob
J
R
K
L
M
P
F
. 3
IG
N
309454D

Advertisement

Table of Contents
loading

This manual is also suitable for:

Accu-shot 233933

Table of Contents