Initial Start-Up - Hayward HeatRelax Installation And Instruction Manual

Table of Contents

Advertisement

3. INSTALLATION AND CONNECTION (continued)
Never use an electrical plug for the power supply.
The electrical power supply must have, in a suitable manner, an
omnipolar protection device of the D-curve circuit breaker type as well
as a 30mA protection differential circuit breaker (see following table).
Models
Power supply
Fuse rating aM
D-curve circuit breaker
Cable section
Use an RO 2V/R 2V or equivalent power cord.
The cables sections are given for a maximum length of 25 m. They
must however be checked and adjusted according to the installation
conditions.
Always shut down the main power supply before opening the electrical
control box.

3.5 Initial start-up

Start-up procedure – once installed, perform the following steps:
1) Turn the fan by hand to check that it turns freely, and that the blades are
properly attached to the motor shaft.
2) Check that the unit is correctly connected to the main power supply (see
wiring diagram in the appendix).
3) Turn on the filtration pump.
4) Check that all the water valves are open, and that the water flows towards
the unit before switching on the heating mode.
5) Check that the condensate drainage hose is attached correctly and does
not cause an obstruction.
6) Turn on the unit's power supply, then press the On/Off button
control panel.
HPR06M
230 V
V/Ph/Hz
1/50 Hz
A
8 aM
A
8 D
mm
3G 1.5
2
HPR09M
HPR12M
230 V
230 V
1/50 Hz
1/50 Hz
10 aM
16 aM
10 D
16 D
3G 2.5
3G 2.5
HPR19M
230 V
1/50 Hz
20 aM
20 D
3G 4
on the
11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hpr06mHpr09mHpr12mHpr19m

Table of Contents