Advertisement

Quick Links

P
P
P
P
P
P
P
P
P
P
P
P
P
A
A
500
500
800
800
800
800
800
800
1200
1200
1200
1200
ZONAIR3D
AIR PRO
500
800
1200
USER MANUAL

Advertisement

Table of Contents
loading

Summary of Contents for Zonair3D AIR PRO 500

  • Page 1 1200 1200 1200 1200 ZONAIR3D AIR PRO 1200 USER MANUAL...
  • Page 3 Zonair3D is a Spanish company operating on all five continents that is engaged in the research and scientific development of air purification systems. In collaboration with a number of scientific institutions and research centres, Zonair3D works on the development of solutions that offer...
  • Page 5: Table Of Contents

    5.8. CONNECTION TO THE ZONAIR3D INDOOR AIR QUALITY PROBE___________ 5.8.1. PRINCIPLE OF CONNECTION DIAGRAM TO ZONAIR3D AIR QUALITY PROBE 5.8.2. DETAIL OF CONNECTION WITH OR WITHOUT PROBE ZONAIR3D AIR QUALITY 5.9. CONNECTING THE UNIT TO THE THE DUCT SYSTEM _____________________ 6.
  • Page 7: Safety Standards And "Ce" Marking

    Consequently, we recommend that all personnel exposed to risks adhere strictly to local regulations in force regarding hazard prevention. ZONAIR3D is in no responsible for any damage or injury caused to persons or objects resulting from failure to comply with safety standards, and any possible modifications to the product.
  • Page 8: Unit Labeling

    Review it carefully to make sure that no parts are missing. If there is any damage to the unit or the shipment is not complete, write down the problems on the delivery slip and send a claim to the carrier. Also report any problems to Zonair3D.
  • Page 9: Installation

    · During the installation, the equipment must be leveled for a good adjustment of the different units and a good opening of the registers. · To check the perfect condition of the fan, the centering of the suction ring can be checked by turning the turbine by hand. AIR PRO 500-800-1200...
  • Page 10: Identification Of Parts Of The Unit

    5.2 IDENTIFICATION OF EQUIPMENT UNITS The main unit consists of the following differentiated sections: prefilter, GRSystem gas filter, fan and absolute filter. The following figure identifies the main components of the main module . 5.2.1 INTERIOR COMPONENTS Flujo de aire Flujo de aire ABSOLUTE...
  • Page 11: Exterior Elements

    (Kg) PRESS. H X W X L (mm) (Pa) 310 x 972 x 1104 0,164 1F/230 V, 50-60 AIR PRO 500 310 x 972 x 1104 0,328 1F/230 V, 50-60 AIR PRO 800 1200 353 x 972 x 1104 0,518...
  • Page 12: Setting-Up Location

    Maintenance Filters and fans maintenance PRODUCT DIMENSIONS RANGE H x W x L (mm) AIR PRO 500 310x972x1104 AIR PRO 800 310x972x1104 AIR PRO1200 353x972x1104 5.5 MOUNTING POSITION HORIZONTAL TRANSVERSAL üüüüü...
  • Page 13: Horizontal Position

    . · No obstacle should prevent or reduce the passage of air both in the suction and in the impulsion. maintenance maintenance registro flow flow AIR PRO 500-800-1200...
  • Page 14: Vertical Position

    The equipment leaves the factory fully wired and tested, thus being a plug and play equipment. Qualified personnel will only have to power the equipment electrically and, if they have the ZONAIR3D air quality probe, carry the necessary control cables. See point 5.6.1, general diagram of electrical connection and control.
  • Page 15: Electrical Principle And Control Diagram

    5.6.1 ELECTRICAL PRINCIPLE AND CONTROL DIAGRAM 5.6.1.1 – AIR PRO 500 AIR PRO 500-800-1200...
  • Page 16: Air Pro 800

    5.6.1.2 – AIR PRO 800...
  • Page 17: Air Pro 1200

    5.6.1.3– AIR PRO 1200 AIR PRO 500-800-1200...
  • Page 18: Connection Panel Diagram

    5.6.2 CONNECTION PANEL DIAGRAM 5.6.2.1 ELECTRICAL AND CONTROL WIRING CONNECTION DETAIL See diagrams point 5.8.1. (A) Black cable = 230V power supply (B) Upper gray cable = planned connection to the Z3D air quality sensorN for filter review notice, there are 2 cables marked with numbers 5 and 6 that correspond to the numbers where they have to be connected inside said probe.
  • Page 19: Filter Status Notice 5.7. Mechanical Connection Of The Unit's Air Pressure Intakes

    9 - ENGINE “-” PRESSURE TAKE-OFF Maintenance Maintenance 11 - ENGINE “+” PRESSURE SOCKET 3 - SOCKET “+” H14 1 - SOCKET “-” H14 4 - “-” INPUT H14 PRESSURE SWITCH 2 - “+” INPUT H14 PRESSURE SWITCH AIR PRO 500-800-1200...
  • Page 20: Pressure Switches - Differential Pressure Probe - Pcb

    5.7.2 CONNECTION DIAGRAM OF ELEMENTS AND PRESSURE PORTS 5.7.2.1 PRESSURE SWITCHES - DIFFERENTIAL PRESSURE PROBE - PCB PAC500V PAC800V PAC1200V...
  • Page 21: Differential Pressure Sensor - Engines 5.8. Connection To The Zonair3D Indoor Air Quality Probe

    Only the probe provided by the Z3D manufacturer can be connected. This probe has several functionalities: · ON/OFF of the equipment depending on the quality of the indoor air. Link with the PCB of the equipment for general notification of change of filters. AIR PRO 500-800-1200...
  • Page 22: Probe

    5.8.1 DIAGRAM OF THE PRINCIPLE OF CONNECTION TO THE Z3D AIR QUALITY PROBE PAC500V PAC800V PAC1200V...
  • Page 23: Detail Of Connection With Or Without Probe Zonair3D Air Quality 5.9. Connecting The Unit To The The Duct System

    It will be checked that the air inlet and outlet are not obstructed or there is any obstacle that prevents its good circulation. If these requirements are not met, the efficiency of the system will suffer. AIR PRO 500-800-1200...
  • Page 24: Start-Up Procedure

    6. START-UP PROCEDURE It is recommended to open the registration panel to verify that there have been no movements during transport, ensuring that the pre-filter, the GRSystem and the absolute filter are correctly placed and fixed in position. The accessible panel can be opened by loosening the 8 M6 star screws (4 on each side), it being very important to tighten them again correctly to ensure the unit's watertightness.
  • Page 25: Emergency Operations

    8.2. FANS Every three months, clean the dirt from the fan blades and bearings, since dirt can not only reduce airflow but also lead to unbalanced operation and increase noise. Periodically, test the airflow on each fan. AIR PRO 500-800-1200...
  • Page 26: Filters

    5 days per week: FILTRO SUSTITUCIÓN Prefiltro (G4) Cada año GRSystem | Zonair3D Cada 4 años Filtro absoluto (H14) Cada 4 años It is recommended that you always have a set of replacement filters on hand. Under no circumstances should be the unit be run without filters, since this can introduce dirt into vital components of the unit lead to equipment wear and loss of efficiency.
  • Page 27: Recycling

    This Zonair3D product is under warranty for three (3) years from when it is delivered. During that period, Zonair3D will be liable for any non-conformity of the product with that set forth the agreement, in accordance with the LDCU. Consequently, during this...
  • Page 28 In addition, the product will not be covered by the Legal Warranty in the following cases: a) If the product has been totally or partially opened, disassembled, manipulated or repaired by a person not authorised by Zonair3D...
  • Page 29 If the non-conformity is the result of improper installation or use of the product that is abusive, improper or not in accordance with the instructions for use and maintenance given by Zonair3D c) If the non-conformity was caused by poor maintenance of the product by the user.
  • Page 30 1200 1200 1200 1200 ZONAIR3D AIR PRO 1200...

This manual is also suitable for:

Air pro 800Air pro 1200

Table of Contents