Advertisement

Quick Links

INSTALLATION
MANUAL
PURE AIR RESIDENTIAL
RESIDENTIAL

Advertisement

Table of Contents
loading

Summary of Contents for Zonair3D PURE AIR RESIDENTIAL 100

  • Page 1 INSTALLATION MANUAL PURE AIR RESIDENTIAL RESIDENTIAL...
  • Page 3 Zonair3D is a Spanish company operating on all five continents that is engaged in the research and scientific development of air purification systems. In collaboration with a number of scientific institutions and research centres, Zonair3D works on the development of solutions that offer...
  • Page 5: Table Of Contents

    5.2. SETTING-UP LOCATION _________________________________________________ 5.3. MAINTENANCE SPACE _________________________________________________ 5.4. ELECTRICAL CONNECTION OF THE EQUIPMENT _________________________ 5.4.1. CONNECTING WITH ZONAIR3D CONTROLLER 5.4.2. CONNECTING WITHOUT ZONAIR3D CONTROLLER 5.5. CONNECTING THE UNIT TO THE THE DUCT SYSTEM ___________________ 6. START-UP PROCEDURE _____________________________________________________ 7. EMERGENCY OPERATIONS _________________________________________________ 8.
  • Page 6: Safety Standards And "Ce" Marking

    Consequently, we recommend that all personnel exposed to risks adhere strictly to local regulations in force regarding hazard prevention. ZONAIR3D is in no responsible for any damage or injury caused to persons or objects resulting from failure to comply with safety standards, and any possible modifications to the product.
  • Page 7: Unit Labeling

    If there is any damage to the unit or the shipment is not complete, write down the problems on the delivery slip and send a claim to the carrier. Also report any problems to Eurofred/Zonair3D. Components should be transported using appropiate hoist and slings. The equipment has corner lugs for loading and unloading.
  • Page 8: Installation

    5. INSTALLATION · The person responsible for receiving the equipment must ensure that the characteristics of the available electrical supply are in accordance with the electrical data on the rating plate of the unit · Before fully setting up the equipment, it must verified that the place where the equipment is going to be located is strong enough to support its weight.
  • Page 9 START-UP OPERATIONS It is recommended to open the registration panel to verify that there have been no movements during transport, ensuring that the pre-filter, the GRSystem and the absolute filter are correctly positioned and fixed in position The access panel is opened by removing the 8 M6 Allen screws (4 on each side), it being important to re-tighten them correctly to ensure the tightness of the unit.
  • Page 10: Identification Of Parts Of The Unit

    5.1 IDENTIFICATION OF EQUIPMENT UNITS The main unit consists of the following differentiated sections: prefilter, GRSystem gas filter, fan and absolute filter. The following figure identifies the main components of the main module . Air flow flow Air flow flow Air flow flow PREFILTER &...
  • Page 11 1- Pressure switch connection cable (black with 2 terminal blocks joined together) 2- Connection cable for Zonair3D air quality probe (probe not included), with 4 marked terminals, 5 and 6 attached to strip, 17 and 18 (attached to strip)
  • Page 12: Setting-Up Location

    RECOMENDED VALUE FOR SETTING H14 PRESSURE SWITCH Definition of the pressure switch value Filter change warning switch H14, knowing that this limits the flow that the machine gives: · If the unit is installed without ducts, the H14 pressure switch is set at about 175 Pa and the machine should not drop below 235 m /h;...
  • Page 13 For ceiling and floor mounting, the equipment must be suspended from the four existing brackets in each unit as follows: ATTENTION: Due to the length and weight of the devices, each unit must be suspended separately. No obstacle shall prevent or reduce the passage of air in suction. FLOOR MOUNTED CEILING MOUNTED MOUNTING POSITION...
  • Page 14: Electrical Connection Of The Equipment

    As a safety measure, if the fan runs out of voltage, it must be made so that all other electrical elements are without voltage. 5.4.1. CONNECTING WITH ZONAIR3D CONTROLLER · Strip the power cable and connect it to 230v (50 / 60Hz) general. It is recommended electrical protection type and connected to the control panel fire alarm.
  • Page 15: Connecting Without Zonair3D Controller

    · For a good reading of the indoor air quality of the Zonair3D probe, it is its proper placement in the space to be treated is very important, please read the instructions for the Zonair3D probe carefully.
  • Page 16: Connecting The Unit To The The Duct System

    5.7 CONNECTION TO CONDUIT NETWORKS The equipment will never serve as support or structure for the conduits. The connection of the equipment to the air ducts must be made through flexible connections to avoid the transmission of vibrations to the installation. It must be checked that the entrance and the air impulsion are not obstructed or that no obstacle is preventing the good circulation of the latter.
  • Page 17: Emergency Operations

    7. EMERGENCY OPERATIONS In case of any anomaly of the equipment, stop the device's operation through the emergency stop button. These emergency operation will be, in general, due to problems with the electrical circuit, in which case will cause problems to the motors, therefore, the device must be disconnected from the electric current to locate the fault, which can be internal to the equipment (short circuits, etc.) or external (supply problems, voltage variation, etc.).
  • Page 18: Fans

    8.2. FANS Clean the blades and impellers of the fans quarterly, as this can produce, in addition to a decrease in flow, disbalance and disturbing noises. Periodically check the flow rates of the fans. 8.3. FILTERS To ensure the effectiveness of particle filters, it is necessary to control the pressure loss that occurs in them (indicative of their degree of dirtiness).