Samsung IWA Series Installation Manual page 59

Led display
Hide thumbs Also See for IWA Series:
Table of Contents

Advertisement

4. Frame installation
※ Refrence1. Frame extension in vertical direction
-
FRAME H and FRAME V placed as extended installation specifications
-
Arrangement of spare JOINT H and HOLDER-MAGNET as extended installation specifications
- In the same way as a single installation, connect the frame V/H using M6, L12 SCREW, and connect the BRACKET-JOINT with M3, L8 SCREW
between HOLDER-MAGNET VERTICAL.
Fig.1 Vertical/horizontal extension installation
(Fig.1)
(Fig.2)
Fig.2 Assembling with consideration of the location of the
fastening hole/guide hole as an extended specification
58
LED R&D Lab(VD)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents