5. Cabinet + Frame installation
◇ CABINET installation (IWA P1.26)
[ UHD SCREEN (36Cabinet) ]
① (Intall the I/G at the bottom) Before installing CABINET, connect and arrange cables to I/G and BRIDGE BOX.(Fig.1)
※ CABINET No. 1 starts at the bottom left, and I/G is placed at the top right of CABINET No. 1 (attached by magnet).
※ I/G and BRIDGE BOX are connected to each other via USB 3.0, and each sensor and S-BOX are connected (Fig. 2).
※ In case of IFA model, BRIDGE BOX and sensor are not needed when installing with SNOWJMU.
I/G
B/BOX
Fig.1 I/G and B/BOX arrangement
I/G
USB type C connection
B/BOX
66
Illuminance sensor
Fig.2 I/G, B/BOX, sensor cable connection
S-BOX(Optical cable connection)
Bluetooth/wifi
LED R&D Lab(VD)