Install The Printer Onto The Printer Mounting Platform - NCR OPTIC 12 Installation Instructions Manual

For gvr encore 500s
Table of Contents

Advertisement

Retrofit G7 Printer GVR Encore 500S (US) Installation Guide
5. Adjust all four height jacking screws MS0178 (inserted in Pre-Installation Step 3), until the Printer
Platform is 2 ½" (about 64mm) above the Dispenser Cabinet Base. Tighten the four MS0177
Screws on the sides. Do not tighten the last MS0177 screw attached to the Cage Nut. For
consistency, ensure you measure from the base of the dispenser cabinet on both left and right
sides:
NOT Here
6.4

Install the Printer onto the Printer Mounting Platform

1. Align and lower the Printer Assembly (MZ0086) onto the studs in the Printer Mounting Platform.
Document Number
Date Released
Revision Number/Security level
Here
48
DCV-00213
May. 2017
R01 S2

Advertisement

Table of Contents
loading

Table of Contents