Table of Contents

Advertisement

Quick Links

www.ti.com
User's Guide
TPA3223 Evaluation Module
This user's guide describes the characteristics, operation, and use of the TPA3223 evaluation module. A
complete printed-circuit board (PCB) description, schematic diagram, and bill of materials are also included.
MODE).........................................................................................................................................................3
1.1 Required Hardware............................................................................................................................................................
1.2 Connections and Board Configuration (BTL MODE).........................................................................................................
1.3 Power-Up...........................................................................................................................................................................
Mode........................................................................................................................................................................7
Configuration.......................................................................................................................................................10
3.2 PWM Frequency Adjust...................................................................................................................................................
Selection.....................................................................................................................................................11
End................................................................................................................................................................11
3.6 EVM Power Tree..............................................................................................................................................................
3.7 LC Response and Overview............................................................................................................................................
POR.....................................................................................................................................................13
3.9 Analog-Input-Board Connector (J28)...............................................................................................................................
Documents.......................................................................................................................................................16
4.1 TPA3223 Board Layouts..................................................................................................................................................
4.2 TPA3223 Board Layouts..................................................................................................................................................
4.3 TPA3223EVM Schematics...............................................................................................................................................
4.4 TPA3223EVM Bill of Materials.........................................................................................................................................
Figure 1-3. EVM Board (Bottom Side).....................................................................................................................................
Figure 1-4. Output Configuration PBTL - 4 Inductors..............................................................................................................
Figure 1-5. EVM Board With Connectors and
Figure 1-6. Filter Frequency Response...................................................................................................................................
Figure 1-7. RESET Circuit.......................................................................................................................................................
Figure 1-8. AIB EVM Connector..............................................................................................................................................
Figure 1-9. TPA3223EVM Top Composite Assembly..............................................................................................................
Figure 1-10. TPA3223EVM Bottom Composite
Figure 1-11. TPA3223 EVM Board
Figure 1-12. TPA3223EVM Schematic 1.................................................................................................................................
Figure 1-13. TPA3223EVM Schematic 2.................................................................................................................................
Figure 1-14. TPA3223EVM Schematic 3.................................................................................................................................
Figure 1-1. Output Configuration
Figure 1-2. EVM Board (Top
Figure 1-3. EVM Board (Bottom Side).........................................................................................................................................
Figure 2-1. Output Configuration PBTL - 4 Inductors..................................................................................................................
Figure 3-1. Filter Frequency Response.....................................................................................................................................
Figure 3-2. RESET Circuit.........................................................................................................................................................
SLAU874 - OCTOBER 2022
Submit Document Feedback
ABSTRACT

Table of Contents

Outputs)..........................................................................................................................7
Output)..........................................................................................................................7
FAULT)...................................................................................................................10
Mode)..............................................................................................................11
List of Figures
BTL......................................................................................................................................0
Side)...........................................................................................................................................0
Jumpers...........................................................................................................0
Assembly.......................................................................................................0
Dimensions.......................................................................................................................0
BTL..........................................................................................................................................3
Side)...............................................................................................................................................4
Jumpers...............................................................................................................8
Copyright © 2022 Texas Instruments Incorporated
Table of Contents
3
4
5
10
12
12
14
16
18
19
22
0
0
0
0
0
0
0
0
0
4
7
13
14
TPA3223 Evaluation Module
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPA3223EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TPA3223EVM

  • Page 1: Table Of Contents

    Figure 1-5. EVM Board With Connectors and Jumpers......................0 Figure 1-6. Filter Frequency Response........................... Figure 1-7. RESET Circuit............................... Figure 1-8. AIB EVM Connector.............................. Figure 1-9. TPA3223EVM Top Composite Assembly......................Figure 1-10. TPA3223EVM Bottom Composite Assembly.......................0 Figure 1-11. TPA3223 EVM Board Dimensions........................0 Figure 1-12.
  • Page 2 Trademarks www.ti.com Figure 3-3. AIB EVM Connector..............................Figure 4-1. TPA3223EVM Top Composite Assembly........................ Figure 4-2. TPA3223EVM Bottom Composite Assembly......................17 Figure 4-3. TPA3223 EVM Board Dimensions...........................18 Figure 4-4. TPA3223EVM Schematic 1............................. Figure 4-5. TPA3223EVM Schematic 2............................. Figure 4-6. TPA3223EVM Schematic 3.............................
  • Page 3: Quick Start (Btl Mode)

    Two 3–8 Ω speaker or resistor loads (make sure that speaker/load is appropriately sized for required wattage output) • Four speaker, banana cables • Four XLR or two RCA input cables • Analog output audio source SLAU874 – OCTOBER 2022 TPA3223 Evaluation Module Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 4: Connections And Board Configuration (Btl Mode)

    1.2 Connections and Board Configuration (BTL MODE) Figure 1-2 shows the EVM board. Figure 1-2. EVM Board (Top Side) Figure 1-3. EVM Board (Bottom Side) TPA3223 Evaluation Module SLAU874 – OCTOBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 5: Power-Up

    1. Ensure the power supply is OFF. Connect the power supply positive terminal to J1 PVDD (red) and negative terminal to J1 GND (black). 2. Connect the left channel speaker, power resistor load (3–8 Ω) to the TPA3223EVM positive output terminal (J9 OUT1+ (red)) and other side of the speaker, power resistor to the TPA3223EVM negative output terminal (J9 OUT1–...
  • Page 6 5. Enable audio input playback and the EVM begins driving audio out of the left and right speakers. If resistor loads are used for testing instead of speakers, then the load will now be energized. TPA3223 Evaluation Module SLAU874 – OCTOBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 7: Setup By Mode

    Setup By Mode 2 Setup By Mode The following sections describe the setup and configuration for each output mode. The TPA3223EVM allows for two output modes: Stereo BTL and Mono PBTL. 2.1 BTL MODE (Stereo - 2 Speaker Outputs)
  • Page 8: Figure 2-2. Evm Board With Connectors And

    1. Ensure the power supply is OFF. Connect power supply positive terminal to J1 PVDD (red) and negative terminal to J1 GND (black). 2. Connect one speaker, power resistor load (3–8 Ω) to TPA3223EVM positive output terminal (J9 OUT1+ (red)) and other side of speaker, power resistor to TPA3223EVM negative output terminal (J9 OUT1–...
  • Page 9: Table 2-1. Jumper And Switch Configurations

    Position 3:4 MASTER(Primary) MODE 2.2.2 Power-Up Ensure that required connections and configurations have been checked. The TPA3223EVM board can now be powered on. 1. Enable the power supply at 12 V to 45 V and ensure that LED D5 illuminates. LEDs D2 and D4 must not be illuminated.
  • Page 10: Hardware Configuration

    3 Hardware Configuration 3.1 Indicator Overview (OTW_CLIP and FAULT) The TPA3223EVM is equipped with LED indicators that illuminate when the FAULT or OTW_CLIP pin goes low. Table 3-1 and the TPA3223 data sheet (SLASEF0) for more details. Table 3-1. Fault and Clip Overtemperature Status...
  • Page 11: Modulation Modes (Ad Mode And Head Mode)

    3.3 Modulation Modes (AD Mode and HEAD Mode) The TPA3223EVM supports both AD modulation as well as HEAD modulation. In AD mode, each of the two half-bridge outputs are continuously switching. AD mode is the default mode for the TPA3223EVM. The EVM also supports HEAD mode modulation.
  • Page 12: Evm Power Tree

    PVDD voltage can still be connected to J1 but jumpers J29 and J26 must be removed. In the case of the TPA3223EVM, only 12V can be accepted as a non-5-V Supply and should be connected to pin 2 of J26 (12V).
  • Page 13: Reset Circuit And Por

    3.8 Reset Circuit and POR The TPA3223EVM includes RESET supervision so that the TPA3223 device remains in reset until all power rails are up and stable. The RESET supervisor also maintains that the device is put into reset if one of the power rails experiences a brown out.
  • Page 14: Analog-Input-Board Connector (J28)

    3.3 V, and so forth), and EVM reset. These plug-in modules allow for an application-specific front end to be plugged into the TPA3223EVM with ease. Examples of plug-in modules include front ends for guitar amplifier, karaoke, wireless sub-woofer, and front-end audio crossover.
  • Page 15: Table 3-7. Aib Power Rail Specifications

    Voltage Range Max Current Source PVDD 15–80 V 500 mA External Source 12 V 12 V 500 mA 3.3 V 3.3 V 100 mA SLAU874 – OCTOBER 2022 TPA3223 Evaluation Module Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 16: Evm Design Documents

    This section contains the EVM board layouts, schematics, and bill of materials (BOM). 4.1 TPA3223 Board Layouts Figure 4-1 Figure 4-2 illustrate the EVM board layouts. Figure 4-1. TPA3223EVM Top Composite Assembly TPA3223 Evaluation Module SLAU874 – OCTOBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 17: Figure 4-2. Tpa3223Evm Bottom Composite

    EVM Design Documents Figure 4-2. TPA3223EVM Bottom Composite Assembly SLAU874 – OCTOBER 2022 TPA3223 Evaluation Module Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 18: Tpa3223 Board Layouts

    EVM Design Documents www.ti.com 4.2 TPA3223 Board Layouts Figure 4-3 shows the EVM board dimensions. Figure 4-3. TPA3223 EVM Board Dimensions TPA3223 Evaluation Module SLAU874 – OCTOBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 19: Tpa3223Evm Schematics

    Figure 4-4 through Figure 4-6 illustrate the TPA3223 EVM schematics. Note: TPA3223EVM with the AMPS174A marking have 5V-PU connected to 5V(5Vto3.3V) supply net externally via wire. This is required for A revision boards for proper operation. IN1+_RCA-XLR IN1+ TO DUT...
  • Page 20: Figure 4-5. Tpa3223Evm Schematic 2

    1.00k ATS-TI1OP-519-C1-R3 100V FAULT OTW_CLIP FAULT FAULT OTW_CLIP RESET-SW TPS3802K33DCKR Orange 4.02k 0.1uF 100V 100V MONITORS RESET RESET-SW 0.1uF Figure 4-5. TPA3223EVM Schematic 2 TPA3223 Evaluation Module SLAU874 – OCTOBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 21: Figure 4-6. Tpa3223Evm Schematic 3

    VOUT VOUT VOUT VOUT 10uF 100uF 10uF VOUT VOUT 6.3V 100uF 6.3V Green 3.3V TP27 TP25 TP36 TP28 TP37 Figure 4-6. TPA3223EVM Schematic 3 SLAU874 – OCTOBER 2022 TPA3223 Evaluation Module Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 22: Tpa3223Evm Bill Of Materials

    EVM Design Documents www.ti.com 4.4 TPA3223EVM Bill of Materials Table 4-1 lists the TPA3223EVM BOM. Table 4-1. TPA3223EVM Bill of Materials Designator Value Description Package Reference Part Number Manufacturer !PCB1 Printed Circuit Board AMPS174 0.047uF CAP, CERM, 0.047 uF, 25 V, +/- 10%, X7R, 0402...
  • Page 23: Table 4-1. Tpa3223Evm Bill Of Materials

    EVM Design Documents Table 4-1. TPA3223EVM Bill of Materials (continued) Designator Value Description Package Reference Part Number Manufacturer J4, J5, J6, J12, J13, J24, J26, J27, J29, Header, 100mil, 2x1, Gold, TH Sullins 100mil, 1x2, 230 mil PBC02SAAN Sullins Connector Solutions...
  • Page 24 EVM Design Documents www.ti.com Table 4-1. TPA3223EVM Bill of Materials (continued) Designator Value Description Package Reference Part Number Manufacturer SH-J1, SH-J2, SH-J3, SH-J4, SH-J5, Shunt, 100mil, Gold plated, Black Shunt SNT-100-BK-G Samtec SH-J6, SH-J7, SH-J8, SH-J11, SH-J12, SH-J13, SH-J14, SH-J15, SH-J16, SH-...
  • Page 25 EVM Design Documents Table 4-1. TPA3223EVM Bill of Materials (continued) Designator Value Description Package Reference Part Number Manufacturer C16, C27, C29, C52, C54 0.033uF CAP, CERM, 0.033 µF, 25 V, +/- 10%, X7R, 0603 0603 GRM188R71E333KA01D Murata C17, C28, C41, C55, C63, C66 CAP, CERM, 1 µF, 16 V, +/- 10%, X7R, 0603...
  • Page 26 EVM Design Documents www.ti.com Table 4-1. TPA3223EVM Bill of Materials (continued) Designator Value Description Package Reference Part Number Manufacturer 49.9k RES, 49.9 k, 1%, 0.1 W, 0603 0603 RC0603FR-0749K9L Yageo America 30.0k RES, 30.0 k, 1%, 0.1 W, 0603 0603...
  • Page 27 EVM Design Documents Table 4-1. TPA3223EVM Bill of Materials (continued) Designator Value Description Package Reference Part Number Manufacturer C26, C37, C45, C61 220 pF CAP, CERM, 220 pF, 50 V,+/- 5%, C0G/NP0, 0603 0603 GRM1885C1H221JA01D Murata C50, C51, C53, C56 1 uF CAP, CERM, 1 µF, 50 V, +/- 10%, X7R, 1206...
  • Page 28 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 29 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 30 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 31 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 32 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...
  • Page 33 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. TI objects to and rejects any additional or different terms you may have proposed. IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2022, Texas Instruments Incorporated...

Table of Contents