10A
An excess or a shortage of refrigerant is the
main cause of trouble to the units.
Charge the correct refrigerant quantity.
07
14
17
18
22
24
27
38
48
54
07
14
17
18
22
30
38
54
Flaring Dimension
Perform the flaring work as shown below.
+0
A
-0.4
(*)It is impossible to perform the flaring work with
1/2H material. In this case, use an accessory
pipe(with a flare).
10
+0
Diameter
A
-0.4
R410A
R407C
6.35
9.1
9.0
9.53
13.2
13.0
12.7
16.6
16.2
15.88
19.7
19.4
19.05
(*)
23.3