4 Mechanical Installation

Select mounting location

4.1
Danger to life or serious injury from fire or explosions!
Do not mount the inverter on a flammable surface.
No combustible materials must be stored within 3 m of the inverter.
The inverter must not be installed in areas and rooms subject to explosion hazards.
The mounting surface must be made of flame-retardant
material.
Do not install in rooms and area subject to explosion
hazards.
Keep away from flammable materials.
The inverter must be protected from dust, snow, rain
and direct thermal radiation (e.g. solar radiation,
central heating radiators, etc.).
The following requirements must be met:
• Relative humidity 5 ... 85 % (non-condensing).
• Ambient temperature -25 ... 60 °C
(40°C at full load).
• Maximum degree of contamination PD 2.
The mounting surface must be solid and able to
permanently support the weight of the inverter unit.
The selected location must be accessible easily and
safely at all times. Ensure no additional aids (e.g. ladder,
scaffolding) are required for access.
8

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Power Storage DC 8.0 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Related Products for RCT Power Storage DC 8.0

This manual is also suitable for:

Power storage dc 10.0

Table of Contents

Save PDF